# Planner

> **Portal:** Admin Portal · **Section:** Modules & Navigation · **Updated:** 2026-11-24
> **Menu:** Planner
> **Canonical URL:** https://docs.field-ascend.com/admin-portal/nav/planner

## What This Area Is For

**Planner Board** is the visual scheduling workspace. You see **engineers down the side** and **time across the day (or week)** — jobs appear as bars you can drag, stretch, and drop to plan work. Below the board, an **Open Jobs** table lists work that still needs scheduling; you can drag rows from that list onto an engineer’s timeline. **Month** view shows the same diary as a calendar grid.

Use Planner when you need to answer: who is free, when is this visit, what if we move everything Tuesday, and how does **planned** time compare to **actual** time or **live** engineer status?

## What You'll See On This Page

### Main title and toolbar

- Heading / **V2** badge on the current Planner Board.
- **Day**, **Week**, and **Month** tabs — switch the calendar layout; your last choice is remembered.
- **Date navigation** — previous / next, **Today**, and a **date picker**; a short label shows the day or range context.
- **Live** — optional. When on, the board keeps refreshing engineer state from the mobile app: travelling, onsite, static, and current job where location data exists.
- **Actual** — optional (day view). Overlays **striped bars** from recorded timesheets: travel out, onsite, return.
- **Travel chips** (day view) — the small car pill between two jobs on an engineer's row shows the drive time between the sites: grey when the gap is long enough, red when it is shorter than the drive (click it to push the next job later), green once fitted. It uses the real road time when Field Ascend already knows that drive (from AI Suggest or the assistant's planning), otherwise a straight-line estimate at your average speed — hover the chip to see which.
- **Mates** — appears when your organisation uses mates/helpers; show or hide mate rows on the board.
- **Subcontractors** — appears when **Subcontractor Dispatch** is enabled and you have active directory contacts; show or hide orange-styled **subcontractor** rows (separate from engineers/mates). Filters can also hide individual subcontractors.
- **Colour:** — **Category** or **Engineer** (all views). **Category** paints job bars from job category colours. **Engineer** paints each job bar with that engineer’s (or mate’s) colour so you can spot who is who; set custom colours under **Planner Settings → Engineer Colours** (or leave **Auto** for the built-in palette). Non-job events keep their event-type colours. Until someone switches it on a computer, the board uses your company's default from **Planner Settings → Planner Bars → Colour the bars by**; once switched, the choice is remembered on that computer.
- **Detail** — on / off toggle (day and week). **On** (the default) draws taller **detailed bars** — with the **Standard** layout, job number on the first line, customer · site · postcode on the second, time and title on the third. **Off** goes back to thin single-line bars so more rows fit. Very narrow bars drop lines automatically so the first line stays readable. Month view has its own compact bars and ignores this toggle. What each line says follows your company's **Planner Bars** layout (see *What the job bars say* below).
- **Columns** — on / off toggle (day view only). **Off** (the default) is the classic board, engineers down the side and the hours across. **On** turns the day round like a diary: engineers across the top, hours down the side, and a job's height is how long it is — drag a bar up or down to change its time, sideways to hand it to someone else, and pull its bottom edge to make it longer. Remembered per person, like **Detail**; TV mode always uses the classic layout.
- **Availability** — on / off toggle with a small menu (since 09/11/2026). **On** draws each engineer's **availability bar** behind their row: a thin green line for the hours they are available that day, hatched green when the day is "works, company hours" (no times of their own), amber for an **on call** shift, and an **Off** label (with the reason) when they are not working — a day off on their pattern, a rota day off, leave, an absence or a public holiday. Small chips by the name name a rota shift, and an **ON CALL** badge marks an on-call day. In **Week** view it becomes a strip at the top of each day's cell — **Nh left** (or the working hours when **Hours left** is unticked), **On call only** or **Off**; **Month** view has no availability bar and hides the button. The menu (the arrow beside the button) lets you show or hide each part — **Working windows**, **Off days**, **On call**, **Hours left (week view)**, **Rota chips** — and has a legend plus links to **Working time settings** and the **Rota**. The choice is remembered on that computer. Where the hours come from: the company's **Working time** (AI Planner Settings) → the person's own **working pattern** (their staff record) → a **Rota** shift whose type has a meaning → leave and public holidays on top. AI Suggest and the AI assistant read exactly the same rule, so what you see is what they plan inside.
- **Changing availability from the board** (needs the Rota permission for shifts, HR Management for a person's weekly pattern) — drag the green bar sideways to move the day's hours, pull its ends to change start or finish, or right-click an empty part of the row and choose **Hours for … on this day…**. After a drag, a small window asks the scope: **Just <date>** (saves a one-day rota shift), **Every <weekday>** (changes the person's working pattern — their normal week; only for people who may change it), or **This week only** (a shift on each working day). The right-click menu also offers **Mark … off on <date>**, **Every <weekday> off (their working pattern)**, **On call on <date>…** (a **From** / **To** window, 17:00 to 08:00 to start with), **Undo changes for <date> (back to their normal week)** and **Open the Rota**. A shift saved here appears on the Rota page under a type that means *Working hours*, *Day off* or *On call* (created for you if none exists).
- **AI Suggest** — opens the **AI Route Optimiser** modal.
- **Notes** — opens **Planner Notes** for the selected day.
- **Filters** — department / skill / category filters for who appears on the board.
- Gear **Settings** menu — week-start preference, link to **Planner Settings** (matching, day sections, engineer colours, calendar sync), and **AI Rules** (AI Planner Settings).
- **Refresh** — the circular-arrow button. Reloads the board and the Open Jobs list. The board also checks for changes made by other people about every 15 seconds and loads them by itself, with a note saying **Planner updated — changes from another user loaded**.
- **Auto-hide** — slides the main menu bar out of the way to give the board more room; this toolbar always stays on screen. Bring the menu bar back by resting the mouse on the top edge of the page, clicking the **Menu** tab that shows there, or pressing **H**; it slides away again once the pointer is back on the board. Remembered on that computer. The same button is on the Jobs, Quotes, Invoices, Customers, Sites, Equipment, Purchases, Credit notes, Tickets, Suppliers, Tools, Parts & Stock, PPM Quotes and PPM Results lists (there it is one switch for all of those lists in that browser, separate from the Planner's).
- **TV** — fullscreen wall display for an office TV; see **TV Mode (Wall Display)** below.
- **v1** — the small button with a back arrow at the very end of the toolbar. Opens the older Planner Board; see **The older planner board (v1)** below.

### What the job bars say (Planner Bars)

What each job bar shows — in day, week and month view and on the TV — is set once for the whole company under **Planner Settings → Planner Bars** (changes apply after **Save**; clicking a bar still shows every detail, whichever layout you pick):

- **Layout** — **Standard** (how the bars have always looked: the job number first, then who and where), **Suburb first**, **Job title first**, **Postcode first**, **Customer Ref first**, **Urgency first**, or **Custom** (your own fields on each line, one of them in bold). **Customise this layout** copies a layout into **Custom** so you can change any line. A **Preview** shows a detailed week bar, a slim bar and a month bar.
- **Show the bold field larger** — draws the bold field (for example the suburb) a size bigger so it reads from across the room.
- **Show status chips on the bars** — the job status and confirmation labels. Untick it for a cleaner wall board; clicking a bar still shows the status.
- **Show hours worked as well as hours planned (week view)** — under each engineer's name the week view shows, for example, **40h planned** and **18h worked** instead of one **40h this week**. Worked is the time logged on jobs that week, travel included.
- **Colour the bars by** — **Job category** or **Engineer**: what each computer shows until someone switches **Colour:** on the board.

### Visits promised as a window ("Tuesday morning")

When a visit was booked as a window (**Find a slot → Promise the customer**, or an outside booking), its bar carries a small **window badge** (e.g. "Morning") and a faint dashed band shows the whole window on that person's row. The bar sits at the real planned minute inside it. Drag or resize it **inside the window** and nothing else happens — the customer is not told, because they were never promised that minute. Drag it **outside** the window and the preview turns amber and you are asked to confirm: the customer will be told the appointment has moved, and once that message has gone the visit is an exact time (the badge goes). Put it back inside the window within a few minutes — or press Undo — and the customer hears nothing and the promise stays. **Optimise route** on a day follows the same rule: it re-orders promised visits freely inside their windows without telling anyone, and asks first if the best route would push one outside. An engineer who re-times their own visit inside its window from the app's calendar keeps the promise too. On the customer portal a promised visit shows as its window ("Morning (08:00 - 12:00)"), not the planned minute.

### Bookings waiting for you to confirm (dashed bars)

A **dashed, striped bar marked "To confirm"** is a booking made from outside (online booking, the phone receptionist or a booking tool through the API) while **AI Planner Settings → Bookings → Outside bookings are** is set to *waiting for the office to confirm*. Right-click it → **Confirm this booking**: it becomes a normal booking, the engineer is added to the job (it appears in their app and they get "New Job Assigned"), and the customer gets your usual booking confirmation. Until then neither the engineer nor the customer is told. A slot someone is in the middle of booking (held for a few minutes) also counts as busy for **AI Suggest** and the availability bar.

### TV Mode (Wall Display)

Click **TV** in the toolbar to turn the board into a fullscreen wall display in place of the office whiteboard. The menu, toolbar, Open Jobs panel and notes disappear; a slim top bar shows the day or week, an **Updated hh:mm** indicator with a green dot and a clock in your company's time zone; the engineer rows and job bars are sized up automatically to fit the screen.

- **It keeps itself current** — within about fifteen seconds of a job being moved, assigned, created or completed by anyone (office or app) the wall redraws. The dot turns amber if the screen has not managed to update for a while and red after ten minutes; it recovers by itself.
- **Live** engineer status (travelling / onsite / static) keeps updating on the wall if it is switched on when you enter.
- **Read-only** — nothing can be dragged or opened from the wall. Press **Esc** or hover the top bar and click **Exit** to return to the normal board.
- **Text size** — hover the top bar for **A−** / **A+**, or **Fit** for automatic sizing. Remembered on that PC.
- **Open Jobs** is hidden on the wall by default. Add `&bank=1` to the address to show it (it shares the screen using your saved splitter position).

To leave it running on an office TV: sign in on the TV PC with a login of its own that has only the access the wall needs (**Remember me** ticked), open the Planner on the view you want, and click **TV**. For a display that comes back after a restart, copy the Planner page's address from your browser, add `?tv=1` to the end, make a Chrome shortcut `chrome.exe --kiosk "<that address>"` and put it in the PC's Startup folder; add `&bank=1`, `&zoom=1.4` or `&theme=dark` as needed. Set the screen to never turn off in Windows power settings — the page also asks the browser to keep the screen awake and reloads itself once a night. If the TV shows **Signed out**, the login on that PC has expired; with **Remember me** it reconnects by itself. TV mode hides the menus but does not change who is signed in — if someone leaves TV mode they can do whatever that login is allowed to do, so use a dedicated login for the wall with only the access it needs.

### Floating / board actions

- **AI Suggest** — date range, run analysis, review score and proposed assignments, then **Apply All**, **Dismiss**, or step **Back**. Optional notify engineers after applying. It never proposes a day an engineer does not work (their own working pattern), approved leave (a half day included), an absence or a public holiday for their region; every territory shape counts; and a visit made by a PPM schedule goes inside the week it is due (an overdue one as soon as possible). It can book anyone on your Planner, whether or not they have an app login, except people unticked under **AI Planner Settings → Who AI planning can book** — those start unticked in the window's **Engineers to include** list, and you can tick them for that run. Jobs it cannot place are listed under **Could not schedule** with the reason — for example when every drive would be over your daily driving limit (the reason says how far away the nearest start point is; a depot or home location in the wrong place is the usual cause). A note at the top of the results says when the Company Depot is missing or only half saved, or when someone has no start location, instead of quietly planning from somewhere else. The rules it follows are on **AI Planner Settings**.
- **AI Rules** — optimiser weights and behaviour (also reachable from Setup).

### The planner grid (Day / Week)

- **Engineers** (and optional **mates** and **subcontractors**) on the left — across the top when **Columns** is on. Subcontractor rows are visually distinct (orange styling) and show dispatch status on bars.
- **Reorder rows** — on **Day** and **Week** views only, an up/down-arrows button beside the **Engineers** corner. Tooltip: *Reorder rows — choose the order engineers appear in (e.g. put an electrician and their mate together)*. Opens **Reorder rows**: drag handles or **Move up** / **Move down**, then **Save order**. Helper text: the order is **shared by everyone in the company** and applies to day, week **and month**. **Alphabetical** clears the custom order (confirm). If a filter is on, the modal lists only the rows currently on the board. **Mates** share the same list (a **MATE** badge) so a helper can sit under their engineer. Subcontractor rows are not in this list. You need the same access as moving jobs on the board. Month view **uses** the saved order but does not show the button — switch to day or week to change it.
- **Time scale** across the top — hours for the selected day (week view shows multiple days); down the side when **Columns** is on.
- **Week view, multi-day jobs** — a job booked over several days shows as **one piece per day**, each sitting in its own day's column in time order (so a job that is last thing Monday and first thing Tuesday sits at the bottom on Monday and the top on Tuesday). The pieces share the job's colour and have a **torn zigzag edge** on the side where the job continues; the true first and last day keep square ends. **Hover** any piece to outline all of that job's pieces and draw a connector between them. Dragging any piece moves **every day** of that job together; the **stretch handles** for adding or removing days sit on the first piece (left) and last piece (right). A day you add by stretching **copies the times of the day you stretch from** — a job booked Monday 08:00–10:00 and stretched to Tuesday is booked Tuesday 08:00–10:00 (the right handle copies the last day, the left handle the first). Change one day's times afterwards in **Day** view. The **Nd** badge still shows the total number of days.
- **NOW** indicator for the current time in your organisation’s timezone.
- **Legend** — when Colour: Engineer is on, shows a swatch per engineer (and mate); day sections and actual-time colours can appear too.
- Job blocks are draggable; snap is typically **15 minutes**. Some interactions open pickers (for example assigning a **mate** or confirming a move). Dragging onto a **subcontractor** row dispatches (or moves) that secure-link assignment and can email them the planned time when schedule-change emails to the subcontractor are on (**Subcontractor Settings**).
- **More than one person on a job** — each person has their own bar, on their own row. Dragging a bar onto another person's row **moves** it to them; the label that follows the pointer says so (**Move to Sam · hold Ctrl to add Sam as well**). Hold **Ctrl** (or **Alt**) while dropping and the label reads **Add Sam as well (Dan stays)** — the first person keeps their bar and the second gets one of their own. Without a keyboard, right-click the bar → **Add another person…**, pick the person, and optionally tick **And every later day … is booked on this job** to give them all of those days in one go.
- **+N not booked** — a small marker on a job's bars when someone is **on the job** (listed under the job's Assigned Engineers) but has **no booked day** on it, so the job is not on their row and not in their diary. Hover it for the names; on a narrow bar and in Week view it is just the count (**+1**). It counts the whole job, not just the days on screen, and is not shown on completed jobs. In Month view the names are in the bar's hover text.
- When **Show pending leave on the planner** is on in **HR Settings**, unapproved leave appears as an amber **Pending leave** bar (in week view it reads, for example, **Pending: Annual Leave**). It does **not** mark the engineer as off and does not block you from booking work on that day. In week view approved leave is a blue, dashed bar showing the leave type's name, and only the name-cell badge says **HOLIDAY** (see **Leave and absence bars (Week view)** below); month view still says **🏖️ Holiday**.
- **PPM due** toggle (Day / Week views, while the company option described below is on — it is on unless someone has unticked it) — shows a read-only strip headed **N PPM visits due, not planned in**: **PPM visits that are due but have no job yet**, one chip per visit on its projected due date, reading customer · site — checksheet (hover for the due date and whether the customer has been contacted; a chip with an amber outline is one where the customer has been contacted and a date is awaited). Chips cannot be dragged — click one to open its contract with that visit's schedule in view, ready to **Book** (which creates the job and puts it on the board). The link at the end of the strip (**Open PPM Visits**, or **+N more — open PPM Visits** when there are more than six chips) opens **PPM/Insp → Visits**. In the **Day** view, a visit whose schedule books its own jobs (its **Planner** tick on, an engineer named, the job not created yet) is drawn instead as a dashed **Upcoming** block in that engineer's row at the visit's time, on the day it will be booked — so next week's regular visits are visible before their jobs exist; click it to open the visit on its contract, and it disappears once the job is created and booked. A visit whose engineer's row is not on the board (for example filtered out) stays in the strip instead. The **ON / OFF** state is remembered on that computer; the strip is switched on for the company by **Show visits that are due but not planned in** under **PPM/Insp → Setup → When a visit comes due → On the planner** (one setting for every contract).

### Leave and absence bars (Week view)

In **Week** view every away day gets a labelled bar in the first lane of the person's row, with their jobs beneath it:

- **Approved leave** — blue and dashed, showing the leave type's name (for example **🏖️ Annual Leave**).
- **Pending leave** — amber, reading **Pending: Annual Leave** (using the leave type's name). It only appears when **Show pending leave on the planner** is on in **HR Settings**.
- **Absence** — red (for example **🤒 Absent — sick**).

With **Detail** on, a second line gives the range, such as **12–13 Oct · 2 days**. The name cell also gets a badge — **HOLIDAY**, **SICK** or **PENDING LEAVE** — plus the number of days (for example **3d**) when the leave or absence covers more than one day; a single half day shows **½**. Hovering a leave day's cell shows the person's name and a summary, such as **Dan — annual leave · 12–13 Oct · 2 days**.

The bars do not get in the way of dragging or right-clicking, and dropping a job on a leave day still warns you. Subcontractor rows get no bars; mates do. TV mode uses bigger text. **Month** view still shows **🏖️ Holiday**.

### Half days of leave

Leave booked as a morning only or an afternoon only, and an absence of half a day or a few hours, are drawn as part of a day instead of a whole one:

- **Day view** — the person's badge adds the part: **HOLIDAY AM**, **HOLIDAY PM**, **SICK ½** (or the hours, for example **HOLIDAY 3h**). Only the half that is off is shaded on their row, labelled **On holiday in the morning** or **On holiday in the afternoon** (the top or bottom half of their column in the **Columns** layout); the other half is left unshaded, and a job there raises no clash warning. Where the record does not say which half — a half-day sickness absence, for example — the whole row is striped and the label says so, such as **Absent — sick — half day (which half not recorded)**.
- **Week view** — a morning off fills the left half of that day's cell, an afternoon off the right half, with **AM** or **PM** in front of the leave name (**🏖️ AM Annual Leave**). When the side is not recorded the bar is full width, striped and tagged **½** (or the hours). In the name cell a half day counts as half (**HOLIDAY ½**, or **HOLIDAY 1.5d** for a day and a half that week), and hovering the day adds the part, such as **Dan — annual leave · morning · 12 Oct**.
- **Month view** — the person's bar adds **AM**, **PM** or **½** (or the hours) after **🏖️ Holiday** or the absence type, and a bar with no side recorded is striped.
- **Booking a job** — dropping a job on a morning or afternoon off only warns when the job overlaps the half that is off (**On holiday in the morning**). Where the side is not recorded the warning reads **On holiday for part of that day — half day**. As with a whole day it is a warning only; it never blocks the booking.

The request forms say which half is booked: **First day: afternoon only** and **Last day: morning only**, or **Afternoon only** / **Morning only** for a one-day request (see the **Holidays** page).

### Month view

- A calendar grid for the whole month.
- Same **Colour: Category | Engineer** control as day/week.
- Jobs appear on their scheduled days; dropping work can open an engineer picker.

### Open Jobs section (below the board)

A second panel titled **Open Jobs**:

- A **splitter bar** between the board and Open Jobs — drag it up or down (or nudge with its up / down arrows) to give more room to the planner or to the backlog. A **collapse** chevron folds Open Jobs away so the board takes the full height; click again to bring it back. The split, the collapsed state and the **Detail** toggle are remembered **per person** and follow you to another computer.
- Badge showing how many **open** jobs.
- Hint: **Drag rows onto the planner**.
- **List** / **Map** mode for the open backlog.
- **Near engineer…** — sort open jobs by distance from an engineer’s home when homes are set.
- **Search** — job number, customer, title, postcode, county, etc.
- Schedule-state filters: **Future**, **Overdue**, **Unscheduled**.
- Rows gently **flash** to show schedule state: **green** when the job still has an appointment to come, **amber** when **every** booked appointment has already finished and nothing is booked ahead — that is, the job needs rebooking. A job with a past visit *and* a future visit booked flashes **green**, because there is still something in the diary. The date shown on the row is the **next** appointment still to come, falling back to the most recent past one when nothing is booked.
- Status and category filters, page size, pagination.
- When **Engineer Job Confirmations** are enabled under **Job Options**, a **Confirmation** filter (**Not confirmed** plus each status name) and a **Confirmed** column (mini chips for assigned engineers — coloured when they have set a status, grey when they have not).
- Sortable table (**Job #**, **Customer**, **Site Name**, **Site Address Line 1**, **County**, **Postcode**, **Title**, **Category**, **Status**, **Hrs**, **Engineer(s)**, **Start**, **Created**, optional **Miles**).
- The **Engineer(s)** column shows who is **booked** on the job first, then — with a small clock-and-person icon — anyone who is on the job but has **no booked day** yet. The column's filter matches the booked names.
- **Dropping a job that is already booked** — the board never quietly removes anyone's days. When the job you drop already has booked days, a window headed **{job number} is already booked** lists who has it and for how many days, and offers **Add {name} as well** (everyone already booked keeps their days), **Move it to {name}** (the window says exactly whose days come off the planner and who comes off the job) or **Cancel**. Dropped on a person who already has the job, the choices read **Add another visit for {name}** and **Move it to this time**. If the customer was promised a time, or a booking is still waiting to be confirmed, the window says so before a Move. A job with no booked days is booked straight away, as before. The same question appears when you assign from Month view's **Assign Engineer** window or from the Open Jobs map.
- Bulk select + **Drag to assign all** when rows are ticked. If some of the ticked jobs already have booked days, the others are booked and you are asked **once** what to do with those: **Add {name} as well**, **Move them to {name}** or **Leave those**.
- **Undo** (in the message shown after a drop) takes back exactly what that drop did: after an **Add** only the new bar goes; after a **Move** the new bar goes and the days that were removed are put back for the people who had them (a promised time window or a waiting-to-confirm state on those days is not restored — they come back as ordinary bookings).
- **Department chips** (only when **Use departments to route work** is on under **Setup → Departments**) — a row above the table headed with your company's word, one chip per department you can see with its count of open jobs. Click chips to show only those departments' jobs; tick **and everything below** to include the departments under them. **Send selected to…** moves the ticked jobs to another department — it asks you to confirm, then reports how many were sent, how many could not be moved and how many left your view. People set to see only their departments get only those jobs here and only their departments' people as rows on the board.

Day-board job bars can show a small **✓ {status}** chip for **that row’s engineer only** (not every engineer on the job). The **Open Jobs** **Confirmed** column shows **all** assigned engineers.

### Planner Notes panel

Opened from **Notes**:

- Day (and in week view, day tabs) for notes.
- **Team note** (everyone with planner access) and **Private note** (only you).
- Optional department scope.
- **Reminders** for the selected day — the same office reminders shown on the Calendar, the Reminders page and the dashboard Today panel (you see the ones your login can see — `admin-portal/nav/reminders.md`). Quick-add with optional time and person (needs **Manage reminders**); tick your own done in place.
- **Save Notes**.

Day notes are also visible without opening the panel: days with a team note show a note strip / flag on the board, so a note left for tomorrow is seen tomorrow.

### Per-engineer day notes

A day note can be attached to **one engineer on one day** ("Dan — collect parts before first job"):

- **Right-click an engineer's row** (or use the engineer's day menu) → **Day note for {name}**.
- The note shows as a chip on that engineer's day; hover or click to read and edit.
- The engineer sees it **read-only** on the app planner and the portal planner — it travels with their day, not buried in a side panel.
- Staff planner (mates) also shows the team note and, when the staff member is linked to an engineer, their personal note — read-only.

### Other modals

- **AI Route Optimiser** — configuration, results with score / warnings / unassigned list, then apply or dismiss.
- **Assign Engineer** (from month / map interactions) — pick an engineer or keep date-only where offered.
- **Create / edit event** — non-job events (admin time, training, parts run) on an engineer’s timeline; **Event types** from App Settings can supply named coloured types. On this board the event window — opened by double-clicking an empty spot on the engineer's row (or right-click → **Add here at …**) and choosing the **Event** tab, or by double-clicking an event (or right-click → **Edit event**) — asks for the title or event type, the start and end time and notes. It has no **Charge to job** box. An event of a type set to be charged to the job (Pricing Settings → Rules → *Time that is neither travel nor on site*) is still charged automatically, to the job the engineer works on before, during or after it. To choose a different job, or **Don’t charge it**, use the **Charge to job** box in the older board's **Edit Event** window (open that board with **v1**, then right-click the event), or in the admin app or the engineers app. The box offers **Pick automatically** (the job the engineer works on before, during or after it), one of that engineer’s jobs that day, or **Don’t charge it**, with a note saying what was charged.

### The older planner board (v1)

The **v1** button at the end of the toolbar opens the previous version of the Planner Board. Both boards work on the same diary — a visit moved on one is moved on the other, in the engineers' app and in the admin app — but they are separate screens with their own toolbars. To come back to this board, click **Planner** in the main menu. One difference to know about: the older board's **Edit Event** window has the **Charge to job** box (see *Create / edit event* above); this board's event window does not.

### Keyboard shortcuts

Press **?** for help. Typical shortcuts: **arrow keys** previous/next, **T** today, **D** / **W** / **M** day / week / month, **N** notes, and **H** to show or hide the menu bar while **Auto-hide** is on. Shortcuts are ignored while typing in a field.

## What You Can Do Here

- Plan and replan visits by dragging job bars between times and engineers.
- Switch **Colour: Engineer** to read the board by person, or **Category** to read by job type.
- Compare **planned** schedule against **actual timesheet** segments when troubleshooting overruns.
- Turn on **live tracking** during the day to see who is moving versus who is checked in onsite.
- Add **non-job events** to an engineer’s day.
- Capture handover context with **Planner Notes**.
- Run **AI Suggest** to propose a route-optimised schedule for a date range, then accept or reject in bulk.
- Pull unscheduled or mis-scheduled work from **Open Jobs** (list or map) onto the board.
- Open **Planner Settings** for matching rules, day sections, engineer colours, and calendar sync; **AI Rules** for optimiser behaviour.
- **Reorder** engineer (and mate) rows so people who work together sit next to each other — one company-wide order.

## Common Tasks

### Plan tomorrow for one team

1. Set the date to tomorrow.
2. Use **Filters** (department) so only that team’s engineers show.
3. Drag **Open Jobs** rows onto each engineer’s free gap, or move existing bars to clear conflicts.

### Colour the board by engineer

1. In the toolbar, set **Colour:** to **Engineer**.
2. Optionally open **Planner Settings → Engineer Colours** and pick custom colours (or leave Auto).
3. Switch back to **Category** when you want category colours again.

### Book a second visit on the same job

A job can hold as many appointments as you need — you do not have to remove the first one to add another.

1. Find the job in **Open Jobs** (or on the board if it is already scheduled).
2. Drag it onto the engineer and time for the new visit. Because the job already has a booked day, a window asks what you mean — choose **Add another visit for {name}** (or **Add {name} as well** when the new visit is for somebody else). **Move it to …** is the other choice: it replaces the days already booked, so do not pick it for a second visit. You can also add the extra day from the job's **Assign & Schedule** tab, or drag an existing bar along the row holding **Ctrl**.
3. Leave the earlier appointment in place. It is the record of a visit that actually happened and it keeps the engineer's timesheet, notes, and photos tied to the right day.

Once a later visit exists, the job's row stops flashing amber and the **Next Visit** column on **Jobs** moves to the new date.

### Book two people on the same job

A job with two operatives needs a bar on **each** person's row — being listed on the job is not the same as having a booked day.

1. Book the first person: drag the job from **Open Jobs** onto their row at the day and time.
2. Add the second person, any of three ways:
   - drag the job from **Open Jobs** onto the second person's row and choose **Add {name} as well**;
   - drag the first person's bar onto the second person's row holding **Ctrl** — the label reads **Add {name} as well ({first person} stays)**;
   - right-click the first person's bar → **Add another person…**, pick them, and tick **And every later day … is booked on this job** when the job runs over several days.
3. Check for a **+1 not booked** marker on the bars — it means someone on the job still has no day in their diary.

Dragging a bar onto another person's row **without** Ctrl moves it to them — the first person loses that bar. Press **Undo** in the message that follows if that was not what you meant.

### Work out why a job is flashing amber

Amber means **every** appointment on that job has already finished and nothing is booked ahead — the job is open but nobody is going back. Either book the next visit, or complete the job if the work is actually finished.

If a job is flashing amber and you believe a future visit is booked, check the visit was saved against **that job** (and not a different job or a non-job event), and check the date — a visit booked for earlier today whose end time has passed no longer counts as upcoming.

### See if engineers are running late against the plan

1. Stay on **Day** view and enable **Actual**.
2. Compare each job’s planned bar with the striped actual layers.

### Watch live progress during the day

1. Enable **Live**.
2. Watch status on engineer rows update as people travel and arrive (requires app location in use).

### Add a stand-up note for the dispatch desk only

1. Open **Notes**.
2. Use the **Private** note, pick the day, type, **Save Notes**.

### Run the AI optimiser for next week

1. Click **AI Suggest**.
2. Set the date range to cover next week.
3. Tick notify engineers after applying if you want push alerts when the plan is written.
4. Run optimisation — read warnings and unassigned jobs.
5. If happy, **Apply All**; otherwise **Dismiss** (running analysis does not change the diary until you apply).

### Plan work for a Dispatch subcontractor

1. Turn **Subcontractors** on in the toolbar (Dispatch must be enabled under Subcontractor Settings; contacts in the Directory).
2. Drag an open job (or existing bar) onto their row at the planned time — confirm if prompted. That sends/updates their secure job link with the planned date/time.
3. Dragging their bar later reschedules them (and can email the new time). Dragging to **Open Jobs** revokes the link.
4. You can also set planner date/time when dispatching from the job’s **Assign & Schedule** tab.

### Put an engineer next to their mate

1. Stay on **Day** or **Week**.
2. Click the up/down-arrows button beside **Engineers**.
3. Drag rows (or use the arrows) so the mate sits under the engineer.
4. **Save order** — everyone in the company sees the new order, including **Month** view.

Use **Alphabetical** if you want to throw the custom order away.

### Change week layout to match how you read calendars

Use the gear **Settings** menu **Week starts on** (**Monday**, **Sunday**, or **Saturday**). The preference is stored for your login. Until you choose, the board starts its weeks on your company's **Week Start Day** (**Setup → Accounts Settings**).

## Important Options

- **Day / Week / Month** are three lenses on the same planner schedule.
- **Colour: Category | Engineer** applies in **all three** views; it only changes how bars look, not who is assigned.
- Engineer colours are configured under **Planner Settings**; job category colours are configured under job category / Job Options setup — do not confuse the two.
- **Live** depends on devices online and GPS — informative, not a legal audit trail.
- **Actual** reads timesheet / time records; empty overlays usually mean nothing was clocked.
- **Open Jobs** is open (not completed) work optimised for dragging to the board, not the full Jobs finance list.
- **Confirmation** on this board is optional. The filter means “any engineer on the job has this status / none set.” The engineer app’s **Confirmation** filter is “**my** status only.” Same-day reschedules keep confirmations; a move to a **different date** can clear them if that option is on in **Job Options**.
- **AI Suggest** respects **AI Rules** and matching-related **Planner Settings**; poor configuration produces weak suggestions.
- Planner dates and times on this board are the diary of record. If an older date on the job disagrees with this board, treat the Planner as the diary of record.

## Common Mistakes

- Expecting **Colour: Engineer** to use custom colours you never set — Auto still paints a palette colour; open **Planner Settings → Engineer Colours** to customise.
- Looking for person colours under category colour setup — wrong page.
- Dragging one piece of a multi-day job in **week** view and expecting only that day to move — every day of the job moves together. Use the stretch handles on the first / last piece to add or remove days.
- Expecting **Live** without the mobile app and location.
- Confusing **Open Jobs** with the full **Jobs** table.
- **Deleting an old appointment to stop a job flashing amber** — never advise this. That appointment is the record of a visit that took place, and removing it breaks the link to that day's times, notes, and photos. Book the next visit instead, or complete the job.
- Reading amber as "this visit was missed" — it only means nothing is booked ahead. A visit that went perfectly still leaves the job amber until the next one is booked or the job is completed.
- Assuming a job must be duplicated to be visited twice — one job can hold many appointments.
- Choosing **Move it to …** when you meant to add a second person — Move takes the other people's days off the planner (the window names them). Choose **Add … as well**, or press **Undo** straight after.
- Expecting a job to appear on a person's row because they are on the job — a row only shows booked days. The **+N not booked** marker and the Open Jobs **Engineer(s)** column show who is on the job with no day yet.
- Expecting the row date to be the first appointment ever booked — it shows the **next** one still to come.
- Forgetting **Apply All** in the AI modal.
- Saving **team** planner notes with sensitive detail everyone can read.
- Assuming **Allocate** on Jobs and **Planner** drags do the same thing — Allocate sets **who**; Planner sets **when**.
- Ignoring **Warnings** in AI results.
- Looking for Dispatch subcontractors under engineer filters only — use the **Subcontractors** toggle and the subcontractors section in **Filters**.
- Expecting a Dispatch subcontractor row without enabling Dispatch or adding them in the **Subcontractor Directory**.
- Treating **Pending leave** on the board as “they are off” — that bar is only shown when the HR setting is on, and it does not block availability. Approved **Holiday** is the booked absence.
- Looking for engineer confirmations on the **Jobs** list — they live here under **Open Jobs** and on **Edit Job → Assign & Schedule**.
- Reading a day-bar confirmation chip as “everyone on the job confirmed” — that chip is only the engineer on that row.
- Looking for **Reorder rows** on **Month** view — the button is on day and week only; month still follows the saved order.
- Expecting a personal row order — it is one order for the whole company.
- Expecting to change what the bars say from the board itself — the bar layout, status chips and planned / worked hours are company-wide settings under **Planner Settings → Planner Bars**. Only **Colour:** and **Detail** are your own choice on the board.
- Looking for the department chips on **Open Jobs** when departments are not switched on — they only appear once **Use departments to route work** is on.
- Looking for **Charge to job** in this board's event window — it is not there. To pick a job, or **Don’t charge it**, use the **Edit Event** window of the older board (**v1**), the admin app or the engineers app.
- Reading a half-width leave bar as a mistake — a morning off fills the left half of the day and an afternoon off the right half, and only a job that overlaps that half raises the clash warning.
- Taking an engineer off a job on the job page's **Assigned Engineers** list — with **Remove**, or by choosing someone else in their row — deletes that engineer's visits on the job, so the job leaves their row on the board. The job page now asks first: a message lists the upcoming visits that go with them (and how many earlier ones), notes any day that would be left with nobody booked (**A day with nobody booked has no visit on the Planner.**) and ends **Remove anyway?** — Cancel leaves the engineer as they were. This question is on the job page only; the board does not show it.

## Related Areas

- **Jobs** — full list, bulk invoice/email, Kanban, and deep filters; **Assign & Schedule** also dispatches subcontractors.
- **Subcontractor Directory / Settings** — Dispatch contacts, seats, chasers.
- **Engineers** — profiles, skills, and departments used by planner filters and matching.
- **Maps** — geographic view of work when your process combines mapping with planning.
- **Planner Settings** — matching rules, day sections, **engineer colours**, **Planner Bars** (what the bars say, status chips, planned / worked hours, default colour), scheduling defaults, calendar sync.
- **AI Planner Settings** — optimiser weights and guardrails.
- **Timesheets** — source of **Actual** overlays when enabled.
- **App Settings** — **Event naming** mode and reusable **Event types** for non-job events.