# Standard Charges

> **Portal:** Admin Portal · **Section:** Setup & Configuration · **Updated:** 2026-10-20
> **Menu:** Setup > Quote Options > Quote Builder > Standard Charges
> **Canonical URL:** https://docs.field-ascend.com/admin-portal/setup/standard-charges

## What This Area Is For

Standard Charges is a shared library of common priced charges — each one is simply a description and a price. It helps office users add repeat charges to quotes and jobs without typing the same wording and price every time.

Use it for non-stock charges such as standard attendance fees, emergency supplements, disposal, parking, admin fees, fixed service visits, or similar repeat extras.

The setup card lives in **Quote Options** (the **Quote Builder** tab) and is organised into sections: **Miscellaneous** first, then one section per **Custom Line Group** (for example Plant or Subcontract) if your business uses them. A charge added under Plant appears only in the Plant pickers and lands in the Plant column/section on quotes and jobs, keeping the group's heading on PDFs and its nominal code on invoices. Charges under Miscellaneous appear in the Misc pickers.

Use **Stock / Parts & Stock Items** instead for parts or products. Use **Structured Task Templates** to save a whole quote row (labour, materials, and picked charges together).

## What You'll See On This Page

In **Quote Options → Quote Builder**, the Standard Charges card has:

- an **Enable Standard Charges** checkbox
- a **Miscellaneous** section listing your misc charges
- one section per custom line group (when you have any)
- an **Add charge** button on each section

Each charge row is just a description box and a price. Rows save automatically as you type — no Save button needed. Job Options links across to the same card because the library is shared.

## What You Can Do Here

You can:

- enable or disable the Standard Charges pickers
- add a charge to the right section (Miscellaneous or a custom group) with **Add charge**
- edit the wording and price inline — changes save automatically
- untick **Active** to hide a charge from pickers without deleting it
- delete charges that should no longer be offered

## Common Tasks

### Add a standard charge

1. Open **Quote Options**, go to the **Quote Builder** tab and find **Standard Charges**.
2. Tick **Enable Standard Charges** if not already on.
3. Click **Add charge** on the section it belongs to — Miscellaneous, or a custom group such as Plant.
4. Type the description and price. It saves automatically.

### Use a standard charge on a quote

1. Open the quote.
2. In the simple list layout, go to **Miscellaneous charges** (or a custom group section such as Plant) and select **Standard charge** (in the footer beside **Add row**). In the sections & tasks layout, click the small receipt icon next to a task's Misc or custom group cell.
3. Pick as many charges as you need — the picker stays open. Press **Done** when finished.
4. In the simple list, each pick adds a new row with the charge's description and price — edit freely. In the sections & tasks layout, the amounts total up in that cell; the task's Item and Description stay exactly as you wrote them.
5. Save.

### View or remove charges on a task cell (sections & tasks)

Everything happens in one modal. Clicking a cell's receipt icon shows the charges already in that cell — each line with a × to remove it and a running total at the bottom. Use **Add standard charge** to expand the searchable charge list inside the same modal and pick more (an empty cell opens straight into that list). Press **Done** when finished. Each picked charge saves as its own line, so PDFs and invoices itemise them.

### Use a standard charge on a job

1. Open the job.
2. Go to **Miscellaneous charges** or a custom group section.
3. Select **Standard charge** and pick the charge.
4. Review or edit the copied description, quantity, and price, then save the lines.

## Important Options

- **Enable Standard Charges** controls whether the pickers appear on quote and job charge sections.
- Each picker only appears when enabled and there is at least one active charge in that section: the Miscellaneous picker needs at least one Miscellaneous charge, and a custom group's picker needs at least one charge in that group's section.
- The section a charge sits in decides which picker offers it and where it lands. Custom group charges follow that group's PDF section and nominal code.
- Picking a charge copies a snapshot. Changing a standard charge later does not alter older quotes or jobs that already used it.
- Typing an amount straight into a builder cell that has picked charges replaces the itemised list with your typed figure.
- Deleting a custom line group moves its standard charges back under Miscellaneous.

## Common Mistakes

- Expecting the picker to appear before Standard Charges are enabled.
- Adding charges but leaving all of them inactive, which means there is nothing to pick.
- Adding a charge under Miscellaneous and expecting it in the Plant picker — the section it sits in is what decides.
- Using Standard Charges for physical parts or products. Use **Stock / Parts & Stock Items** for those.
- Using Task Templates for priced charges. Task Templates are for work-scope wording and default row pricing, not the charge library.
- Assuming an old quote or job will change when a standard charge is edited. Existing rows stay as they were.

## Related Areas

- `Job Options`
- `Quote Options`
- `Jobs`
- `Quotes`
- `Stock`
