Jobs (admin app)

Admin Mobile AppMenu: JobsUpdated 2026-11-24Markdown (.md)

What this area is for

Jobs in the Field Ascend Admin app is the office's phone view of your work orders. From it you can find any job, open it and change its details and status, put engineers on it and book the visits, read and add notes and tasks, manage equipment, parts and engineer times, fill in checksheets, certificates and compliance checks from the office, email or text the customer, and raise invoices, quotes, purchase orders and tickets from the job.

It works on the same jobs as the web portal. Changes save as you make them, so you need a signal; they show straight away on the web and on the Planner, and in the engineers app after its next sync. Photos and files you add are the one exception: they are kept on the phone and upload in the background (see Add photos and documents below).

You need access to Jobs on your login to open this area; without it the app shows Access denied. Changing anything needs permission to edit jobs — without it you can look, but every field and button is read-only.

What you'll see

The Jobs list

  • The title Jobs with the number of matching jobs, and New job at the top right (only if your login can edit jobs).
  • A search box, Job no, customer, site, postcode. It matches the job number, title, customer name, site name, the first line of the site address, the postcode and the customer reference. The × clears it.
  • Three square buttons beside the search: sort (arrows), filters (sliders — it shows a number while filters are on) and Scan a job label (QR icon).
  • Open / Completed / All tabs. Open (not yet marked complete) is the default.
  • A row of chips for every filter that is on — tap a chip to remove that filter.
  • Archived jobs are left out unless you switch on Include archived jobs.
  • Scroll to load more; pull down to refresh. On a tablet the list shows two columns.
  • Opening the list from a dashboard tile starts it with that tile's filters, shown as chips — for example Managed by me for jobs where you are the manager.

What a job card shows

  • A coloured strip down the left in the job's status colour (green once the job is complete).
  • The job number (with a # in front), a green tick when complete and an archive icon on archived jobs (archived cards are dimmed).
  • The customer (No customer if none) and Ref with the customer reference.
  • The status pill (No status when none is set) and the job price — the price only shows if your login can see job prices.
  • The job title, then tags: urgency and category in your company's colours, PPM, how much of the job is invoiced (green Invoiced when fully invoiced, amber Invoiced 30% when part-invoiced, red Over-invoiced 130%, grey Credited / Over-credited when credit notes cancel it out, green Marked when marked as invoiced; no tag when nothing is invoiced — a login that cannot see job prices sees Invoiced for any invoiced job), and on open jobs with a target completion date Overdue (red), Due today or Due plus the date (amber when it is within a week).
  • The assigned engineers, or Unassigned.
  • The site address and postcode (No site if none) and, on the right, the next booked visit (Today, Tomorrow or a date). An open job with nothing booked from today onwards shows Unscheduled; a finished job shows its completion date.

Filters and sorting

The Filter jobs sheet has: Scheduled (Any time, Today, Next 7 days, This month — jobs with a visit booked in that window), Invoicing (Any, Invoiced, Not invoiced), Assignment (Only unassigned jobs), Visibility (Include archived jobs), then Status, Urgency, Category and Engineer — one choice each (All statuses, Any urgency, All categories, Anyone). With more than eight engineers there is a Search engineers box; the Engineer list is hidden while Only unassigned jobs is on. Done closes the sheet and Clear all filters resets everything.

The Sort jobs sheet: Newest first (default), Oldest first, Job number, Next visit, Due date (target completion), Price: high to low, Price: low to high. Any sort other than Newest first is named next to the Jobs title.

Scan a job label

The QR button opens Scan a job label. Point the camera at the QR code on a job label (the label the office prints from a job in the web portal) and that job opens. Anything else you scan or type — such as a job number — is put into the search box instead. You can type into Scan, or tap to type a code (the keypad icon brings up the keyboard), and a Bluetooth scanner types into the same box. If the camera is off you see Camera access is off with Allow camera. The camera view has torch and pause buttons.

The job screen

Tap a card to open the job. Jobs also open from a customer's or site's jobs list, from an equipment record and from the lifecycle chart.

  • The header has a back chevron (long-press it to jump straight back to the list you started from), Job # and the number, and the status pill — tap the pill to change the status if you can edit the job. A breadcrumb trail under the title takes you back to where you came from, for example the customer.
  • At the very top, any warnings for the job's customer and site show as coloured strips — the same ones the job page on the web shows: your own customer and site warnings (those set for Everyone or Admin, and for All or Jobs), plus CUSTOMER ON HOLD, CASH ONLY CUSTOMER (or your company's own name for that tick, e.g. PROFORMA ONLY CUSTOMER, when set in Customer Options), CEASED TRADING and OVERDUE INVOICES when they apply. OVERDUE INVOICES names an amount, so it is left out when your login isn't allowed to see job prices.
  • Below it is the action bar, then the tabs: Details, Work, Equipment, Assign, Messages, PPM, Labour, RAMS. Messages only appears when your company uses Messaging and your login is allowed to use it; a red number shows unread messages.
  • An archived job shows This job is archived — read-only until it is unarchived.
  • Pull down to refresh the job.

The action bar

  • The INVOICE strip: the linked invoice number(s) or Not invoiced, a progress bar and a percentage (green at 100%, amber for a part-invoice, red when over 100%, Fully credited or Over-credited when credit notes cancel it out, Marked when marked as invoiced; a job with no value that has an invoice reads Invoiced — the same bar as the web job page and Jobs list), and a line with the net invoiced, the job value and anything credited. For a login that cannot see job prices, the strip shows the invoice number(s) and Invoiced, without a percentage or amounts. Tap it to open the job's invoices (only if your login can see invoices).
  • The toolbar: Comms, History (only with Audit Log (History) on your login), Email, Text (only when SMS is switched on for your company), PDF, Quote, Invoice, PO and Ticket. The last four only show if your login can see quotes, invoices, purchase orders or tickets, and each carries a count of linked records.
  • A row of links: Customer (opens the customer), Make project, Archive / Unarchive and Delete (these last two need permission to delete jobs).

What you can do here

Details tab

Lifecycle flowchart — the job and everything linked to it (the ticket it came from, quotes, invoices, purchase orders, credit notes, subcontractor dispatches, projects). This job is marked HERE. Tap a box for a summary (customer, site, engineers, status, total, dates, work notes and photos) and Open record to go to it. Credit notes, work orders and dispatches say Open this record on the web — no app screen for this type yet. With nothing linked it reads Just this job — no quote, invoice or PO linked yet.

If the job came from a quote with a survey form, a card named after the form (From the accepted quote — read only) sits at the top; View opens it.

Basic job details — each field saves as soon as you leave it. Text boxes show Not saved while you type and Saved once it has gone.

  • CUSTOMER — tap to search and pick another customer. + New opens the New customer form; the job takes the new customer and the first site you enter. If that name already exists, Open existing puts the existing customer on the job instead. Changing the customer clears the site. On a PPM contract job it says Locked to PPM contract; there, or if you can't edit the job, tapping the customer opens their record.
  • SITE — pick one of the customer's sites, or + New to add one. Under it: a map with Open Site and Edit Site (Edit needs permission to edit sites), the address with copy and directions buttons, and the site contacts — each with an email button and a large call button for each number, labelled MOBILE, LANDLINE or PHONE (press and hold a call button to copy the number). Contacts are labelled SITE CONTACT, or CUSTOMER CONTACT / INVOICE CONTACT when no site contact is set; with none at all it says No site contact set — tick one under Edit Site.
  • The site area (only when your company uses Site Areas, under your own name for them) — Entire site or one area.
  • JOB NUMBER — read-only, with a PROJECT or SUB-JOB badge where it applies. Change on web (open jobs only) opens the job in the web portal in your phone's browser, where the number can be changed.
  • CREATED DATE AND TIME and CREATED BY (read-only), then MANAGER — the office user planning the job in (No manager clears it).
  • The department (only when your company routes work by department, under your own word for it) — it says why the job is there, or Not routed yet — pick one, or leave it for the command centre. Tap it to send the job elsewhere. If you send it outside the departments you can see, the app tells you it has left your departments and takes you back.
  • START DATE (type YYYY-MM-DD), TITLE, LEAD TIME (DAYS).
  • CURRENCY — "Only relabels the job — the prices already on it are not converted. Locks once the job is invoiced."
  • OUR REF, CUSTOMER REF, CATEGORY and STATUS.
  • Your company's own job fields (up to two, directly under Status, only when job custom fields are switched on in Job Options) — a coloured picker (Not set clears it), a date picker or a text box.
  • URGENCY, and TAX RATE when your company has tax rates.
  • TARGET COMPLETION — a countdown (OVERDUE by …, time remaining, or Job completed) and where the date came from (Customer SLA, Global SLA or Manual). Type a date and time (YYYY-MM-DD HH:MM), or type a number, choose hours, days or weeks and tap Set to make it that long from now.
  • The Mark as Complete switch (see Common tasks), and PRICE (read-only, only if you can see job prices).

Photos & documents (Public — "These files can go on job-sheet PDFs and customer emails. Visible to engineers and customers.") and Private documents (Office only — "Not visible to engineers, customers, or on job sheets. Use for contracts, costings, supplier quotes."). Each card is laid out like the job page in the engineers app:

  • Three buttons: Camera (one photo), Gallery (several photos at once) and Docs (any file — PDFs, spreadsheets, and video files too; the app cannot record video itself).
  • Filter chips All, Images, PDFs, Video once the card has files. With none it reads "No photos or documents yet".
  • The files as tiles. A public photo carries a BEFORE, AFTER or JOB LOGGING pill when it has been tagged, and its caption underneath; a private file shows a small padlock. Delete sits under each file — it asks "Delete photo?" (or "Delete document?") — "This permanently deletes … from the job. It cannot be undone."
  • Press and hold a photo for Photo details (see Common tasks). The tip under the tiles says so.

Tap a file to view it: photos open full screen, PDFs open in the viewer (its download button lets you save or share), other files open through Share.

Job prep (only when your company has switched on Job Prep in Job Options on the website) — the job's prep list with a Ready or Not ready 2/5 tag and what it is still waiting for. Tap a tick-box line to tick or untick it (needs permission to edit jobs). A line that needs a tool from a category ticks itself when a tool from that category is reserved for the job. Type in Add something for this job only… and tap Add for a one-off; press and hold a one-off to remove it. The job's purchase orders and whether they are received are listed underneath.

Work tab

On a phone a Notes / Job Scope switch sits at the top; a tablet shows both.

Notes — five sections: Work to be Done, Work Done, Additional Work Required, Notes and Office Notes (Private). Each has an Add a new note… box and Add Note. Entries stay oldest first, each showing who created and last modified it, with Edit and Delete. Adding to Notes sends a notification to the assigned engineers. Office Notes (Private) stay in the office.

Signatures — the customer, engineer (and any subcontractor) signatures on the job; tap one to view it. If you can edit jobs, you can sign here too:

  • Add customer signature — hand the phone to the customer. Type their name in Customer name, they sign, then tap Save (or ✓ Save Signature).
  • Add engineer signature — this is your own signature. Your name is filled in from your login, you sign, then tap Save. If you also have an engineers app login, it counts as your signature there too.
  • When one is already saved, the button says Sign again and asks "A customer signature is already saved for this job. Sign again?". Every signature is kept, and the job sheet shows the latest one.
  • A saved signature shows as waiting until it has uploaded, and it is kept on the phone until then, so it is not lost if the app closes or the signal drops. If an upload fails, tap it to Retry or Remove.
  • Signing here never stops you completing a job from the office. The "force customer / engineer signature" rules only apply in the engineers app.
  • Subcontractor signatures can be viewed but not added here.

Job Scope / Tasks — the job's task list with a progress bar, grouped by equipment, custom section or General / Site-wide (with From Quote and View equipment where they apply). Each task shows its status — Open, Complete, Not completed, Not applicable or Further quote raised — its notes, category and who completed it. You can:

  • tap Complete or Not Completed, write the note it asks for (What was done? / Why was this not completed?) and Confirm. A task that is tracking a defect then asks Is the defect resolved? — Yes — resolved closes the defect; No — still open completes the task and keeps the defect open on the asset.
  • Reopen a finished task, Edit it (title, notes, category, grouping → Save task) or Delete it.
  • add photos to a task (Add photo → Camera or Library, then Before, After or None); the small buttons under each photo change its tag. Press and hold a task photo (even one still waiting to upload) for Photo details — a caption and the tag, the same as on the Details tab. The caption shows under the photo.
  • use Add task: TASK TITLE, NOTES (OPTIONAL), CATEGORY (OPTIONAL), GROUPING / EQUIPMENT (General / Site-wide, Custom section… with a SECTION NAME, or a piece of equipment on the job). With equipment chosen, and defect tracking on, you can tick Also log as a defect on the asset and pick a severity.

Equipment tab

What you see depends on whether your company allows more than one piece of equipment per job (Job Options on the web). Where the app lets you choose a piece of equipment — the grouping choice when you add or edit a task, and EQUIPMENT TO ATTACH when you create a quote from the job — it is named the way your company chose under Equipment Setup → Custom Fields → What the equipment pick lists show on the web; until a choice is saved there, the usual description shows.

  • One piece per job — a box showing the job's equipment; tap it to pick another unit from the site, or No equipment. On a PPM contract job the unit can't be changed.
  • Several pieces — Multiple equipment supported, a summary line when there are several units (count, status counts, F-Gas required / F-Gas ✓), and a card per unit: photo, description, type, Ref, S/N, location, warranty date (marked (Expired)), status, and an F-Gas chip on refrigerant equipment (F-Gas required, F-Gas ✓, F-Gas: Not tested, or plain F-Gas when not required for this job). Each card has View/Edit, F-Gas, Remove and a STATUS picker. When your company has ticked Offer a parent's status change to its child assets (Equipment Setup → Statuses on the web), changing a parent unit's status asks Also change the child assets? — Change N or Just this asset. Add (or Add Equipment on an empty job) picks more units from the same site (Search this site…). It only shows when your company lets the office add equipment to jobs (Equipment Setup on the web) and your login is allowed to add equipment. A PPM contract job with several units shows Locked to PPM contract and can't be changed.
  • Machines at the customer's other sites — when your company has ticked Our customers' equipment moves between their sites (Equipment Setup → Permissions on the web), typing two or more letters in Search this site… also lists the customer's machines at their other sites, each with where it is recorded. With Move equipment to another site on your login, Move here and add shows what will happen (the machine moves to the job's site, its PPM schedule follows) and Move and add moves it and adds it to the job; without it you only see where the machine is. Same customer only, one at a time; on a job that can hold only one machine it says so before moving anything.
  • View/Edit opens the equipment record over the job — photo, documents, status, fields, QR code, PPM schedules, defects (Raise defect, Quote, Create job), PPM check history, jobs history (Create job, Create quote), parts fitted and more. See Equipment (admin app) for the full record.

Assign tab

  • Engineers — Assign adds an engineer who isn't on the job yet; the × removes one (Remove engineer). When your company uses Engineer Job Confirmations, each engineer has a confirmation chip: with one confirmation status it switches between that status with a tick and "Not …"; with several it opens a picker with Not confirmed and your statuses. Statuses marked Engineer only — the office cannot set this can't be chosen. When engineer positions are switched on, a position chip (No position or the position) sets their position on this job.
  • Mates / Helpers (only when your company uses mates) — Add or remove helpers. "Helpers are added to the days this job is already scheduled. They are never given a new date of their own."
  • Schedule — the visit calendar:
  • A legend of the assigned people (mates shown dashed) and the Weekend, Bank Holiday, Holiday and Absent colours. A sun or thermometer icon on a day means that engineer is on holiday or absent; a warning triangle means they are booked on another job that day.
  • PLANNED HOURS (Auto or Manual, with Reset to auto) sets the default day length; DEFAULT START and DEFAULT END are the times newly booked days get.
  • Month arrows and Today. Tap a day to book it for everyone assigned; tap it again to remove it. Press and hold, then slide, to book a range — sliding from a day that is already booked clears the range instead. Clear All removes every booked day.
  • The app warns when an engineer is on holiday or absent ("… Schedule on this date anyway?") or when nobody is assigned yet (No engineers assigned).
  • Changes save on their own a moment later (Saving…, then Saved — and the number of entries).
  • Schedule Details lists each booked day: tap people's chips to add or drop someone for that day only, change each person's start and end times, or remove the day with ×. Totals: TOTAL DAYS, TOTAL HOURS, DATE RANGE.
  • Subcontractor Dispatch — only when your company uses Subcontractor Dispatch and your login can see subcontractors (see Common tasks).

Messages tab

The job's message group. With none yet you see Create Group: the people on the job and you are ticked; search Search people... to add others (people marked Messaging off can't be added), then Create Group. Once it exists the tab shows the latest messages, Open Chat (adds you to the group and opens the conversation), Manage (name and members → Save Changes) and Archive (it leaves everyone's inbox, the history is kept, and you can start a new group afterwards). Create Group, Manage and Archive only appear for office users allowed to manage job groups.

PPM tab

Despite its name, this tab holds all the job's forms:

  • PPM Checks (done / total) — each checksheet with Complete, Pending or a red Unable to complete (with the reason; the heading adds "n unable") and its equipment; a red one has Revisit quote, which starts a quote for that unit whose first line says why the checksheet could not be done (needs permission to edit quotes). Inside a checksheet that allows it you can also mark it Unable to complete yourself — pick a reason or type one, add photos (no minimum for the office) — and Undo it. Complete (or View once done), PDF, Remove (not started) and Archive (finished — hides it from the job sheet and emails; Archived PPM below has Restore). Attach adds a checksheet; Remove … blank clears empty sheets. Inside a checksheet, when the unit has readings from earlier visits, a Readings history card above the questions shows each reading line of that checksheet (latest value and result, the change, a small chart, lowest and highest) — the same rows as the equipment record; tap its title to fold it.
  • Defects (when defect tracking is on) — open defects found on the job's equipment, grouped by unit. If your login can edit jobs, Quote puts a defect on a new quote and Create job raises a follow-up job for it; the app says which quote or job it made, with Open quote / Open job.
  • Compliance (done / total) — each check with its percentage and who fills it in (Office, Engineer or Every engineer); Complete / View and Remove. Attach adds one.
  • Certificates (done / total) — Complete, Pending, Waiting for equipment or Not applicable; Complete / View, PDF and Remove. A certificate that covers each piece of equipment has a row per unit, with Not applicable (give a reason — it then counts as done) and Undo not applicable. Attach adds one.
  • Log cards (only when your company uses them, under your own name for them) — every card that applies to the job's site, area or equipment, marked Entry added, Required or No entry, with Add entry or View / add entry. They follow the site and equipment automatically, so there is no attach or remove here.

Complete or View opens the form full screen (the back arrow or a swipe from the left edge closes it):

  • PPM checksheet — the same questions the engineers app shows (number boxes show the last reading, pass bands, data tables, photos, signatures, Add defect). When the checksheet's rule for that answer (or reading, or table column) has Photo required ticked, each defect needs a photo — Save draft and Complete stop with "Photo required — This check requires a photo of the defect before saving." until one is added, as in the engineers app. A job with several units has a chip per unit; switching with unsaved answers asks whether to save. The Equipment Details card has Edit or View. When your company carries defects forward, Previous Defects need Still Open, Resolved or Couldn't check. Buttons: Save draft, Skip equipment (a reason is required), Complete & generate PDF, View PDF and Unskip equipment. Empty required fields get a warning, but you can Complete anyway. When a photo question on the checksheet has Photo notes switched on (in the PPM checksheet builder on the web: Engineers can add a description to each photo and / or Engineers can tag photos Before / After), press and hold a photo for Photo details — a caption, a Before / After tag, or both, whichever the question allows. It saves straight away (no Save draft needed) and shows under the photo. Whether it prints on the PDF is also set on that question.
  • Certificate — the template's fields and tables; worked-out results show Calculated from the answers above, and a panel shows Cannot complete yet, Warnings or All certificate rules satisfied. Save draft, then Complete & issue certificate numbers it, locks it and makes the PDF. An issued certificate is read-only: "Locked — use Reissue on the web to make corrections."
  • Compliance check — answer every question (ones marked Optional don't count); numbers must be in range; sketch questions offer Draw, Draw on the drawing or Photo + mark up. A check set for Every engineer first asks you to Choose copy — whose copy to fill. Save draft and Complete (only at 100%).
  • Log card entry — Entries on this job, Recent history, and + Add new entry with Entry date and the card's columns → Save entry. On a completed job, add entries from the web.

Labour tab

  • Quoted hours — on a job priced from a quote, the quoted labour lines and Total. When your company prices labour in days, each line reads the way the quote does (for example "1 day at £450.00/day") instead of hours.
  • Engineer times — one block per labour line: the engineer (Select engineer), the date (YYYY-MM-DD), Travel out, On site and Return start and end times (HH:MM), the price list it is priced on (Auto until you pick one — the picker is titled Rate band), 2-person and Remove. A saved line shows its total and its callout, travel and onsite amounts, and its Billed times when your company rounds billed time. When your company allows manual labour overrides there are AMOUNT OVERRIDES (BLANK = CALCULATED) boxes for Callout, Travel and Onsite plus an Override reason. A confirmed line shows Locked and can't be edited. Add adds a line; Save times saves the whole card.
  • Materials — each part has Description, Qty and Sell price; typed parts also have Cost / unit and Markup % (cost and markup work out the sell price; typing a sell price works out the markup). Chips show Stock, Quoted and the linked equipment; a stock part also shows its Part no. and Shelf under the description. On a stock part the description stays as the stock item's; the Sell price and Markup % can be changed (the cost comes from the stock item — "No cost price on the stock item" leaves markup off), and tapping its Qty opens Change quantity (see Common tasks). When the quantity can't be changed a line under it says why. Link equipment / Change equipment (Site / General or a unit — on stock parts too; it moves no stock and changes no price), Mark extra (on jobs that came from a quote — it then reads Extra ✓), Remove, or Undo (return to stock) on stock lines. Parts save on their own: a typed part saves once it has a description and a quantity, and the line under the card says Parts save automatically., Saving…, Not saved yet: … or Not saved: … with Try again. Add adds a blank part (starting at your company's default markup, if set); From stock opens the stock picker.
  • Miscellaneous charges — Description, Qty, Cost, Uplift %, Sell; Standard adds one of your company's Standard Charges; Add (the new line starts at the default markup your company set for Miscellaneous lines — or, in a custom line group, for that heading; if neither is set, the default markup for manual materials); Save misc. Your company's custom line groups follow, each with its own Save button.
  • Mileage (only when mileage charging is on, in miles or km) — date, engineer, description, distance and rate; Save mileage. There is no cost box here: in the profit estimate a line uses your company's cost per mile unless it carries its own cost (typed on the web job page, or carried over from the quote).
  • Pricing summary — engineer times (with callout, travel and onsite), materials, miscellaneous, line groups and mileage, with Not in price / In price chips on quoted jobs, and Net price. When job discounts are switched on, JOB DISCOUNT offers None, % or an amount, with a reason → Save discount.
  • Profitability — only for logins allowed to see job profitability: revenue against labour, materials, other charges, purchase orders, subcontractor and expense costs, profit and margin, with Over budget warnings on quoted jobs. When your company costs mileage (What a mile costs you in Pricing Settings on the web, or a cost on the job's mileage lines), a Mileage cost (cost per mile) row joins them and the mileage cost counts in the Other charges part of the bar.

RAMS tab

  • A line explains how RAMS are chosen at your company (automatically by job category, pinned by the office, or picked by the engineers).
  • Each required RAMS (marked Pinned if the office added it, Job's version when this job has its own copy, Every shift when it must be signed on each day worked) with a row per assigned engineer: Signed (with PDF), Requested (with Cancel) or Outstanding — tap the bell to ask that engineer to sign; they get a notification. An amber line under a person explains a signature that may not count yet: Signed before the office filled in the job details, Waiting for the office to fill in the job details, Asked to sign again or Signed the library version — this job has its own. An Every shift RAMS also shows a chip per day with ✓ or ✗.
  • Job details still to fill in — use the job page on the web. shows under a RAMS whose job details the office has not completed yet; those details are filled in on the web.
  • Pin adds a RAMS template to the job; Detach removes a pinned one ("Any signatures already collected are kept"). Other signatures on file lists any other signed copies.
  • Customer authorisation (only when customer sign-off is switched on): earlier requests with their status (Resend / Cancel while pending), then Recipient name, Recipient email, Select RAMS to send and Send sign-off.

Done in the web portal, not the app

Use the job's page in the web portal (Edit Job) for: changing the job number (Change on web), deleting a job, converting it to a project (Make project only shows a note), duplicating a job, printing job labels, linked jobs and main jobs, unlinking or re-linking records on the lifecycle chart, quoting not-completed tasks (Quote not completed / Quote this), adding F-Gas refrigerant entries, credit notes, reissuing or voiding a certificate, the RAMS pack, People on site, sending survey forms, allocated stock, and more than one subcontractor dispatch on a job.

Common tasks

Find a job

  1. Open Jobs and type a job number, customer, site name, postcode or customer reference into the search box.
  2. Switch between Open, Completed and All as needed.
  3. Tap the filter button to narrow by visit date, invoicing, unassigned, status, urgency, category or engineer; tap a chip to drop a filter.
  4. Or tap the QR button and scan the job's label to open it directly.

Create a new job

  1. On the Jobs list tap New job (you can also start one from a customer, site or piece of equipment, which fills those in for you).
  2. Optionally search for the customer under CUSTOMER (OPTIONAL), or tap + New customer. Then pick a site under SITE (OPTIONAL) or add one with + New site — a customer with only one site has it chosen for you. You can leave both blank and pick them on the job.
  3. Optionally pick a preset under FROM PRESET (OPTIONAL) — it fills the title, category and references.
  4. Tap Create job & open (or Create job from the preset). The job is created straight away with today's date, the next job number and your company's starting status, and it opens so you can add the title, engineers, schedule and so on.
  5. If the customer is on hold or blocked you see Cannot Create Job with the reason and Override and create anyway; customer or site warnings show Customer/Site Warnings with Proceed Anyway or Back.

Change a job's status

Tap the status pill at the top of the job (or STATUS on the Details tab) and pick a status. Only statuses the office is allowed to set are listed.

Put engineers on a job and book the visits

  1. Open the Assign tab and tap Assign to add each engineer (and Add under Mates / Helpers if your company uses mates).
  2. In Schedule, check PLANNED HOURS and the default start and end times.
  3. Tap the days to book, or press, hold and slide across a range.
  4. Adjust individual people or times under Schedule Details. It saves on its own; the visits appear on the Planner and in the engineers' apps.

Mark a job complete (or reopen it)

  1. On the Details tab tap the Mark as Complete switch.
  2. If forms that must be finished first are still open (required PPM checksheets, compliance checks, certificates, log cards or F-Gas records), the app shows Cannot mark as complete: with the list. Finish the checksheets, checks, certificates and log cards on the PPM tab (F-Gas records on the web), then try again.
  3. Once complete it reads ✓ Job Complete with the date and time. Your company's status automation and completion email (if you use them for that category) run as they do on the web.
  4. To reopen a completed job, tap the switch again.

Email the job sheet to the customer

  1. Tap Email in the action bar.
  2. Pick the PDF TEMPLATE if you have several (the recommended one is chosen for you).
  3. Check TO (filled from the customer contacts for the job's category), CC (OPTIONAL), SUBJECT and MESSAGE (filled from your Email Setup template — edit freely).
  4. Under PDF ATTACHMENTS switch on what to include: Job Sheet PDF, completed PPM check sheets, certificates, compliance checks, F-Gas logbooks and Risk assessments (RAMS) (completed copies and blank plans), ticking the individual items under each. With any of the extra PDFs switched on, choose Separate files or Combined document under DELIVERY METHOD. Tick any public job documents under ADDITIONAL ATTACHMENTS.
  5. Tap Send to Customer. It is queued and usually sent within one or two minutes, and the Comms history opens.

Text the customer about a job

  1. Tap Text (shown only when SMS is switched on for your company).
  2. Tick the contacts under TO (contacts who have opted out, or without a mobile number, can't be picked) or add another number.
  3. Pick a QUICK TEXT or type the MESSAGE; the chips under the box insert job details. The counter shows how many texts and credits it will use.
  4. Tap Send, which also shows the credits. The results list who it was sent to, and the text appears in Comms. The note above the button says how the text is sent: normally customers can't reply, so include a phone number if you need an answer; on US accounts "Reply STOP to opt out." is added automatically.

See what was sent, and who changed what

Comms lists every email and text sent about the job, with its status — tap one to read it. History (with Audit Log (History) on your login) lists field changes and events on the job, with who and when.

View or share the job sheet PDF

Tap PDF, then tap a template (the recommended one is highlighted). The job sheet opens in the viewer; its download button lets you save or share it.

Raise an invoice from a job

  1. Tap Invoice (or the INVOICE strip), then + Create invoice for this job (needs permission to edit invoices).
  2. Type a percentage or an amount, or tap Remaining, All (100%), 50% or 25%. If the job has already been part-invoiced, the sheet opens on the remaining balance.
  3. Tap Create invoice (or Invoice remaining balance). The new invoice opens.
  4. If the job has already been invoiced you are warned and offered Invoice the remaining balance, Continue anyway (asks again — it does not deduct what was already billed) or Cancel. If the job is missing a field your company requires before invoicing (or a PO the customer requires), the invoice isn't created and the app says what is missing.

Tap Invoice, then Link existing invoice, search by invoice number and tap the invoice. An invoice already linked to another job is moved to this one (the app warns you first).

Create a quote from a job

  1. Tap Quote, then + Create quote from this job (needs permission to edit quotes).
  2. On a job with two or more pieces of equipment, untick any you don't want under EQUIPMENT TO ATTACH.
  3. Tick Quote sits before this job only for the emergency / breakdown flow where the quote goes in front of the job (if your company hasn't switched that on, it is linked as a follow-up quote instead).
  4. Tap Create quote — the new quote opens.

Raise a purchase order or ticket from a job

Tap PO, then + Create PO for this job, pick a supplier (optional) and add notes, and tap Create purchase order — the PO is linked to the job and opens. Tap Ticket, then + Create ticket for this job — a ticket is created with the job's customer and site, linked to the job, and opens.

Add parts from stock

  1. On the Labour tab tap From stock.
  2. Search (Search name, part #, barcode…), browse Favourites or Browse by category, or tap the scan button — each scan adds one.
  3. Set quantities with the steppers (a stocked item can't go above what is in stock), then tap Add … items to job.
  4. For serial-tracked parts, tick the units under Which units?. When the job has equipment, choose the unit each part is for under Assign to equipment (or leave Site / General) and tap Confirm & add.
  5. Parts that create equipment ask whether to add the new equipment to the job (Add to job) or leave it on the site (Site only). The stock is taken out of stock; Undo (return to stock) puts it back.

Change the quantity of a stock part

Tap the stock part's Qty on the Labour tab. Change quantity shows how many are on the job now; use − / + or type the number and tap Save. For a stock-counted item the extra is taken from stock, or the difference put back where it came from, straight away (stock moves in whole units); for an item that isn't stock-counted the number changes and no stock moves. The quantity must be above 0 — to take the part off the job use Undo (return to stock).

Add or correct engineer times

On the Labour tab tap Add on Engineer times (or edit an existing line), choose the engineer, type the date and times, change the price list or 2-person if needed, and tap Save times.

Fill in a PPM checksheet, certificate or compliance check from the office

Open the PPM tab, tap Complete on the form, fill it in and use Save draft as you go. Finish with Complete & generate PDF (PPM), Complete & issue certificate (certificate) or Complete (compliance). If a form you need isn't there, tap Attach on that card.

Send a job to a subcontractor

  1. On the Assign tab tap Send to Subcontractor (needs permission to edit subcontractors).
  2. Pick the subcontractor (search Search name, trade or town or filter by trade — expired insurance is flagged). Optionally fill in AGREED PRICE, DUE DATE, SCHEDULED DATE / START, a SITE CONTACT and INSTRUCTIONS, and set Share end-customer name, Share job documents and Also raise a purchase order.
  3. Tap Send Dispatch — they are emailed a secure one-job link to accept, upload photos and submit the work. If your company composes the email first, the button reads Continue to Email: choose the work instruction template (Preview work instruction), check TO, SUBJECT and MESSAGE, and choose the attachments. Keep the {dispatch_actions} line in the message — it becomes the secure View Job button (the Job link toolbar button adds it back). Then tap Send Dispatch.
  4. Afterwards the card shows the subcontractor and status. Manage Dispatch offers Resend link, Approve and Request changes once work is submitted, Raise PO and Revoke (the link stops working at once). To choose which of their submitted materials or mileage go onto the job, amend the terms, message them, or add a second subcontractor, use the job's page in the web portal.

A subcontractor whose record does not have Gets job links ticked (on their subcontractor page on the web) shows No job links — nothing is sent in the list. Picking one hides the site contact and sharing switches, the box becomes NOTES (NOT SENT TO THEM), and the button reads Put on Job: they appear on the job and the Planner, but nothing is emailed and no dispatch seat is used. Their card then reads On job — no job link, with Mark done and Take off job in place of Resend link and Revoke; to email them or send the purchase order, use the job's page on the web.

Add photos and documents

On the Details tab, on Photos & documents (visible to engineers and customers) or Private documents (office only), tap Camera, Gallery or Docs. Files appear straight away marked Waiting to upload, Uploading… or Waiting for connection, and upload in the background while the app is open. A failed upload shows the reason with Retry, or remove it with ×. A strip at the top of the app shows anything still waiting — tap it for Retry now or Remove failed. Photos from the camera or gallery are checked first: iPhone (HEIC) photos are turned into ordinary JPEGs, and a file that is not a photo is turned away with Could not add photo and the reason ("That file is not a photo this app can use…") — add a file like that with Docs instead.

Add a caption or a Before / After tag to a photo

  1. Press and hold the photo on the Details tab (or on a task in Job Scope). It works on a photo that is still waiting to upload too.
  2. Photo details opens: type a Description / caption ("Optional caption shown under the image") and, on public photos, pick a Category — Before, After, Job Logging or None. "Job Logging = an office reference photo, kept off job sheets and customer PDFs." Private documents have no category, only the caption.
  3. Tap Save. The pill and caption show on the tile. If the photo finished uploading while the sheet was open, the app says "Photo just uploaded — Long-press it again to add the details."

Delete a photo or document

Tap Delete under the file and confirm. It is removed from the job for good — there is no undo.

Archive or unarchive a job

Tap Archive in the action bar and confirm. The job becomes read-only and is hidden from active lists, the Planner and the engineers app; invoices and history are kept. Unarchive makes it editable again. Both need permission to delete jobs.

Important options

  • What your login allows (set per person on the Staff form in the web portal): Jobs view and edit; Delete jobs (also archive / unarchive); View job prices & charges; View job profitability (internal costs & margin); Audit Log (History); and the quote, invoice, purchase order, ticket, subcontractor, site and equipment permissions behind those buttons. Buttons you aren't allowed to use are hidden or read-only.
  • Hidden job prices. If your login can't see job prices, the app hides the price on job cards and the job's PRICE field, the invoice strip shows no invoicing figures, and the Labour tab says "Prices and charges are hidden for your account. Times, materials and miles are shown read-only." — engineer times, materials, miscellaneous lines and mileage without any money.
  • Company switches that change this area: Messaging (the Messages tab), SMS (the Text button), Engineer Job Confirmations and engineer positions (Assign chips), mates, Subcontractor Dispatch, departments, Site Areas, job custom fields, more than one piece of equipment per job, letting the office add equipment to jobs, defect tracking, log cards, customer RAMS sign-off, manual labour overrides, job discounts, mileage charging, Standard Charges and custom line groups. Most are set in Job Options, Equipment Setup, App Settings, Pricing and the other Setup pages in the web portal.
  • Saving. Details fields, notes, tasks, statuses, schedules, equipment, materials and the actions on the PPM and RAMS tabs save as you go. Engineer times, Miscellaneous charges, line groups, Mileage and JOB DISCOUNT need their own Save button, and forms need Save draft or Complete.
  • Online only. Apart from photo and file uploads, everything needs a signal. If a save fails the app shows Could not save with the reason — check your signal and make the change again.

Common mistakes

  • Expecting multi-select filters. Each filter takes one value (one status, one category, one engineer). For several at once, column filters or CSV export, use the Jobs list in the web portal.
  • "Unscheduled" on a job that has had visits. The card only shows visits booked from today onwards; an open job whose visits are all in the past reads Unscheduled until the next one is booked.
  • Tapping the complete switch on a finished job. There is no confirmation — it reopens the job at once. Completing it again later sends the completion email again if your company sends one for that category.
  • "Cannot mark as complete". A required PPM checksheet, compliance check, certificate, log card or F-Gas record is unfinished — the message lists which. Finish it on the PPM tab (F-Gas records are done on the web).
  • Leaving a form without saving. Closing a PPM, certificate, compliance or log card form with the back arrow doesn't save it — tap Save draft (or Save entry) first.
  • Typing times and moving on. Engineer times only save when you tap Save times; the same goes for Save misc, Save mileage and Save discount. Materials are different — they save on their own.
  • Times like "1:30". Without am or pm the schedule reads times as 24-hour, so 1:30 is 1:30 in the morning. Type 13:30 or 1:30pm.
  • Changing the customer and losing the site. Picking another customer clears the site — pick the new site straight after.
  • Working on an archived job. Everything is read-only, and Email / Text answer "You need edit-jobs permission…". Tap Unarchive first.
  • Linking an invoice that belongs to another job. Link existing invoice moves it to this job; it no longer counts against the other one.
  • Choosing "Continue anyway" when invoicing. It creates a second invoice without deducting what was already billed. Use Invoice the remaining balance unless you really mean to bill again.
  • Expecting F-Gas entries in the app. The F-Gas button on an equipment card only shows a note — refrigerant entries are added on the web. You can still attach F-Gas logbooks when you email the job.
  • Looking for Delete, Duplicate, labels or linked jobs on a job. They aren't in the app — see Done in the web portal, not the app.
  • Request changes on an Android phone. Android asks you to use the web portal to send the subcontractor your feedback; on an iPhone you type it in the app.
  • Switching subcontractor. The app handles one dispatch per job — Revoke the current one before sending the job to someone else.
  • Uploads that never arrive. Photos and files only upload while the app is open. Keep it open until the strip at the top clears, and check for Upload failed messages.
  • Jobs (web portal) — the full table view, bulk actions, Kanban and everything listed under Done in the web portal, not the app.
  • Quotes (admin app) — quotes created from a job open here.
  • Invoices (admin app) — invoices created or linked from a job open here.
  • Customers (admin app) — customer and site records; their jobs lists open jobs, and New job starts from them.
  • Equipment (admin app) — the full equipment record behind View/Edit, defects, and new jobs from a unit.
  • Planner (admin app) — booked visits from the Assign tab appear on the Planner.
  • Stock (admin app) — the stock that From stock draws from.
  • Purchases (admin app) and Tickets (admin app) — purchase orders and tickets raised from a job.
  • Messages (admin app) — job message groups also appear in Messages.
  • Engineers app — Jobs — what the engineers see and do on the same job.