Field Ascend Help Centre

PPM Contract Schedule Builder

Admin PortalMenu: PPM/Insp > Open a contract > Schedule Builder tab (and Details & billing)Updated 2026-11-24Markdown (.md)

What This Area Is For

The PPM Contract Schedule Builder is the full contract workspace. For people who can edit PPM schedules it is the contract page: PPM/Insp → Open a contract (or New Contract → Full contract / Regular visits plan) and it opens on the Schedule Builder tab, with Details & billing beside it. It is where admins maintain one contract's schedules, checksheets, equipment, rotations, seasons, spreadsheet imports/exports, job creation controls, and — on Details & billing — its details, billing and renewal. People without permission to edit PPM schedules get a read-only Schedules view instead (see the PPM contract page doc).

A schedule row describes a repeat visit pattern: site, equipment, checksheet, start date, frequency, optional planned day, engineer, job preset, pricing, notes, and whether the generated jobs should be added to the planner.

Each asset’s next PPM due on the Equipment list and on the equipment edit page is taken from these schedules (the earliest next visit across active schedules covering that asset, including multi-equipment rows). Changing a schedule’s next visit date, pause flag, or equipment list updates what that asset shows.

What You'll See On This Page

Contract header and status banners

The top of the page is the contract's header: a Contracts › customer link back to the list, the contract number, customer and name, a status pill (Active, Paused, Ended, or Paused — customer … with Open the customer), the contract's dates and how it is billed. Under it are the two tabs, Schedule Builder and Details & billing. The banners below (paused, created from a quote, renewed / not renewing / renewal quoted) show on both tabs.

The Renewal bar at the top of Details & billing holds Renew Contract (hidden once the contract is renewed) and Renewal status: …, which opens a small menu for setting the renewal state by hand: Mark as renewal quoted (the renewal was quoted on another quote — for example one quote covering several of the customer's contracts), Mark as renewed (optionally picking the next contract from the customer's other contracts), Mark as not renewing, and Clear renewal status. Renew Contract marks the contract renewed for you. A contract set to one of these shows a banner — RENEWED (with a link to the next contract), NOT RENEWING or RENEWAL QUOTED — with the date it was set. Visits still due in the current term carry on as normal whichever one is set.

If the contract is paused, a banner explains whether it is a manual pause or a policy pause caused by the customer being ceased, cash-only (or your company's own name for that tick, set in Customer Options), on hold, or on hold automatically for exceeding their credit limit (that banner says the hold clears itself once payments or credits bring the balance under the limit, or you can raise the limit on the customer). Which customer states pause contracts is set under PPM/Insp Checks Setup → Auto-Pause PPM/Insp by Customer Status. Paused contracts and paused schedules do not generate new PPM jobs.

Start dates and next-visit dates are checked for plausibility when you save — a mistyped year (for example a two-digit year) is refused with an error rather than saved.

Contract details (Details & billing)

Use this section for contract name, start date, end date, internal notes, the Customer Ref / PO Number, and the Pause all schedules in this contract checkbox.

The Customer Ref / PO Number box holds the customer's reference or purchase order number for this contract. Tick Apply this Customer Ref to all jobs created from this contract and that reference is copied onto every job the contract creates.

Below the box and its tick sits PO mandatory for this contract. Tick it when every visit job and contract invoice must carry a Customer Ref / PO before it can be invoiced or sent — visits without one show a red "Missing" box. It is off by default and saves with the card's Save. Renew Contract copies the tick to the renewal. It only stops an invoice being created from a job or an invoice being emailed without the reference — PPM visits are never blocked.

Agreed yearly prices (Details & billing)

Under Contract Details is the Agreed yearly prices card: how much the contract's prices go up on each anniversary. A contract made with Create Contract from a PPM quote of more than one year arrives with the quote's years already in it; any other contract can have them added.

  • The table lists Year, From (the day that year starts, counted from the contract's start date), Increase (a percentage, or an amount with comes to … beside it when the visit prices add up to a few cents either side of it), Annual value, and whether the year is Applied (with the date), This year, or After the end date — not charged. Total over N years is underneath.
  • Years already applied show what really happened. Years not started yet are worked out from the contract's prices today, so a schedule added or re-priced mid-term is included.
  • Change (people who can edit PPM schedules) edits the years not applied yet: a percentage or an amount for each, Add a year at the end, or remove the last one. Applied years cannot be changed. A contract with none shows Add yearly price increases.
  • An amount is shared across the visit prices in proportion and each price is rounded to the cent, so the year can come out a few cents either side of the sum. The contract, its PDF and its invoices always use the real figure.
  • The years count from the contract's start date. Without one the card says so and no year starts until a start date is set in Contract Details.

On each anniversary the visit prices move to that year's price by themselves — every schedule's visit price, each checksheet price, each piece of equipment's price on a per-equipment schedule, and the contract price on a contract billed at a set amount — and the contract's annual value follows. It is checked once a day, and also whenever the contract page is opened (the card then says Year N prices now apply). A paused contract still moves: the price is agreed by calendar year. Work made ahead of an anniversary already uses the new year's price: a visit job created before the anniversary for a visit due after it, and a contract period invoiced in advance. Nobody needs to change a price by hand. Changing a schedule's price mid-term is fine — the next year goes up from the changed price.

Renewal: a renewal quote made from a contract with agreed yearly prices starts with the same contract length and increases (change them on the quote if needed); the renewal's Price uplift % still sets the first year's price. Apply Renewal copies the quote's years onto the new contract, or — when it extends the same contract — replaces the years not applied yet with the quote's, numbered on from the current term.

Renewal Quote Settings

A collapsible Renewal Quote Settings block (when used) lets you Automatically quote the renewal of this contract. Choose a trigger (Before the contract end date or Every year (anniversary)), a mode (Remind me only, Create a draft, or Create + auto-email), Lead time (days before the renewal date), and an optional Price uplift %. Save Renewal Settings stores the plan. Create Renewal Quote Now builds a draft immediately. End-date trigger needs a contract end date. Remind-only never creates a quote by itself — the contracts list shows RENEWAL QUOTE DUE. PPM renewal quotes live on the PPM Quotes channel, not the main Quotes list.

When a Visit Comes Due — Defaults

The last card on Details & billing, When a Visit Comes Due — Defaults, sets what new schedule rows on this contract start with (each row can still be changed; existing schedules are untouched):

  • Default due action — Use company default (Create job), Create job, Create quote — job on acceptance, or Job + invoice. Job + invoice is greyed out with (contract billing already invoices visits) when this contract already bills visits.
  • Default cadence — Use company default (Fixed), Fixed — calendar grid from the start date, or Floating — next due after each completion.
  • Save Due Action Defaults.

Booking reminders, appointment reminders, how visit quotes are grouped, what happens when a visit quote is declined, and the planner's PPM due strip apply to every contract — they are on PPM/Insp → Setup → When a visit comes due (the card links there; see the Regular visits doc). Booking reminders are off until Remind the office to book visits is ticked there; each number in Remind this many days before a visit fires once per visit — one morning email listing the visits due (who receives it is set on the Notifications page), one bell and a to-do per visit; ticking the to-do marks the visit Contacted on the Visits page. Automations can act on the same moment (trigger a PPM visit needs booking), and Appointment reminders raise the trigger a planned visit is N days away, so an automation can email or text the customer.

Each schedule row can also carry its own booking settings: Customer must confirm the date (the visit stays Planned until confirmed on the Visits page or by the customer completing a pre-visit form) and Remind … days before due (a per-schedule override of the company list). Nothing is sent to customers by these reminders unless you build an automation for it — they alert the office.

Each schedule row can override with Create job / Create quote / Job + invoice, a Next due counts from the last completion tick (floating; unticked = fixed calendar), and days before due. The tick works from ONE checksheet: on a row that carries two or more checksheets (different units on different sheets, or a rotation) it is unticked and greyed out with the reason, and a ticked row cannot take a second checksheet — put each service that runs from its own completion on its own row (two rows due the same day make two jobs). A row saved before this rule with the tick and two checksheets keeps working as it is; a change to its checksheets will not save until it is unticked or split. The same goes for certificates: a row with a certificate on chosen visits only (see Certificates below) cannot use the tick — those visits would be skipped — so the tick is greyed out with the reason; put the certificate on every visit to use it. Helper text: quote raises a PPM quote in the lead window (accepting creates the job); Job + invoice creates the job and a draft invoice for that visit together.

Auto-Invoicing Settings (Details & billing)

When billing is enabled, the card shows:

  • billing frequency such as Per-Visit, Monthly, Quarterly, or Annual
  • billing timing: In Advance or In Arrears
  • pricing method: schedule/checksheet pricing or a custom annual price
  • billing start date, tax rate, auto-create invoice toggle, and a live billing preview
  • Next Invoice Date — an editable date showing when the contract is next billed, with Last invoiced underneath once an invoice has been raised. Edit it to delay or pull forward the next bill (for example after deleting an invoice raised by mistake); leave it blank to reset to the billing start date. Both the automatic biller and the manual button below read this date, so it is the one lever for "when is this contract next billed".
  • Create Invoice Now — raises the next contract invoice straight away (off-cycle), linked to the contract; the next invoice date moves on by one period. Save any unsaved billing changes first. The same Create Now button sits on the PPM contracts list. Invoices raised either way carry the contract's Customer Ref / PO.
  • Cost Per Visit (shown on contract PDF) — optional amount that overrides the calculated per-visit average on the contract PDF Pricing Summary only. Placeholder Auto (average). Leave blank for the calculated figure. Does not change billing or invoices. Available in any pricing mode.

What a contract invoice contains: one charge line, under Miscellaneous Items, for the whole amount. It never copies a visit job's labour, material or mileage lines. The amount depends on the billing settings:

  • Per-Visit, In Advance: the price of the next visit job on the contract that is not yet completed or invoiced (the earliest booked one).
  • Any frequency In Arrears: the total of the visit jobs completed in the billing period that are not yet invoiced.
  • Monthly, Quarterly or Annual, In Advance: the contract's custom price for that period, otherwise the annual value divided by 12, 4 or 1.

So a contract whose per-visit price and annual value both show zero can still bill the visit jobs' own prices. The visit jobs an invoice covers are marked as invoiced. To get separate labour and material lines, untick Track billing schedule for this contract and invoice each visit from its job, like any other job.

Schedule Builder table (Schedule Builder tab)

The main table is the active schedule workspace. It contains:

  • Add Row for one schedule at a time
  • Quick Add / Apply All controls at the top of the table
  • 1 Row / Equip to create one row for each equipment item at the selected site
  • 1 Row / Site to bundle all equipment at a site into one multi-equipment schedule row when multi-equipment is available
  • Apply to All controls for checksheet, price, start date, end date, frequency, engineer, job preset, and Last done
  • Last done (per row and Apply to All) — a date for the last service already done. The first visit is seeded one interval after that date (the start date fills in). A hint such as First visit: or Already due appears. Seasonal schedules ignore Last done. Use this when you are taking over an existing contract and do not want the first generated visit on “today”.
  • column toggles next to Show columns: at the top of the table — End Date, Planned Day & planner, Equipment, Checksheet and Certificates
  • End Date is hidden until you tick it
  • Planned Day & planner, Equipment, Checksheet and Certificates show by default (untick to hide for a simpler view; equipment-type auto-linking still works in the background). Your choice is remembered on that computer — if you hid Planned Day & planner before, it stays hidden until you tick it again.
  • saved rows highlighted green; each row's controls are ✓ (save the row), the bin (delete the schedule), Create jobs, and Compliance where a schedule can follow a compliance requirement

For each schedule you can set site, equipment, checksheet, price, start/end dates, frequency, planned day, engineer, job preset, notes, seasonal settings, and planner options.

Each schedule's card and the visits under it

Every row is drawn as a card. A band above it shows the schedule's number (#1, #2…), its name, how often it repeats, when it starts, and a chip — Up to date, N overdue, Paused or Not saved. Under the row are the visits it makes:

  • a sentence saying what the schedule does (how often, which day, who, where its jobs go and how far ahead they are created), then its next visits;
  • Visits with ‹ › to move the window and back to now — weekly to 4-weekly schedules are shown in weeks, monthly to 6-monthly in months, yearly and longer in years, each counting from the schedule's own start;
  • one line per piece of equipment, each cell showing the visit's day (or month) and its checksheet letter (– = general visit), coloured done (green), booked (blue), upcoming (dashed), overdue (red) or skipped (struck through);
  • Pattern repeats every N visits (1–120, with its length in words such as = 1 year) — how long the checksheet rotation is, so a cycle can stretch over more than one year;
  • Quick fill checksheet — one checksheet on every visit of every piece of equipment on the schedule (or no checksheet (general visit)), after a confirmation.

Changing a saved row previews it. The visits redraw dashed with Not saved — the dashed visits are a preview. Press ✓ on the row to save. Nothing is stored until ✓. If a schedule's stored next visit is further away than its frequency allows (it was not brought forward when the frequency changed), a red line says The next visit is not until … with Carry on from today, which plans it from today.

Click a visit for its details: date, checksheet, done / booked (with the planner date and time) / job created, not planned in / not created yet, why it was skipped, and a link to its job (opens in a pop-up window). Buttons, where they apply: Book or Re-plan (date, from, to, engineer → Book it — creates the job first if needed and puts it on the planner), Create the job now, Skip this visit (a reason is needed; the customer is not told), Put it back (undo an office skip). Under them This visit uses shows that pattern position's Job preset and, for each piece of equipment, its checksheet, — no checksheet — or Not on this visit; change them and press Save what this visit uses, or use on every visit to set every position at once. This is where checksheets are rotated across visits, an asset is left off one visit, or one visit uses a different job preset.

Spreadsheet tools

The schedule toolbar includes:

  • Export — downloads the current contract schedules as an Excel workbook.
  • Template — downloads a smart Excel template named ppm-schedule-template.xlsx, pre-filled with the customer's sites and equipment where available.
  • Upload — imports .xlsx, .xls, or .csv schedule data through a preview-and-confirm flow.

The spreadsheet includes a Schedules sheet and a Valid Options sheet used for dropdowns. The template also includes a Help sheet explaining each column and which advanced options must be finished inside the Schedule Builder after import.

What You Can Do Here

  • Edit contract details and pause/resume schedule generation.
  • Configure contract billing and auto-invoicing.
  • Add schedules one at a time with Add Row.
  • Create many rows quickly with Quick Add, 1 Row / Equip, 1 Row / Site, and Apply to All.
  • Export current schedules to Excel for review or offline editing.
  • Download a smart template for bulk schedule creation.
  • Upload a spreadsheet and confirm which parsed rows should become schedules.
  • Build multi-equipment and rotating-checksheet schedules.
  • Create the next set of PPM jobs immediately instead of waiting for automatic generation.
  • See the visits each row makes (previewed before you save), and book, re-plan, create, skip or put back one visit from under its row.
  • Renew a contract with Renew Contract: New contract for the next term copies every schedule with its dates moved on — the old contract is marked renewed and finishes its own term; it is not paused — or Extend this contract in place keeps the same contract number and moves the end dates on. The dialog pre-selects your default from Setup → PPM/Insp Checks Setup → Renewals, and you can choose differently for one renewal.
  • Set the renewal status by hand from Renewal status: renewal quoted, renewed (to a contract you built yourself, or none in the system), not renewing, or clear it.

Common Tasks

Add one schedule row

  1. Select Add Row.
  2. Pick the Site.
  3. Pick the Equipment or choose multiple equipment items if multi-equipment is available. Each piece of equipment is listed under the text your company chose in Equipment Setup → Custom Fields → What the equipment pick lists show (its description, then the details you ticked); until a choice is saved there it reads as it always has.
  4. Pick the Checksheet or use the auto-linked checksheet suggested from the equipment type.
  5. Set Start Date and Frequency.
  6. Add engineer, job preset, planned day, price, notes, seasonal bands, or planner settings if needed.
  7. Save the row when prompted by the row controls.

Add many schedules quickly

  1. In Quick Add / Apply All, choose a site or All Sites.
  2. Use 1 Row / Equip for one schedule per asset, or 1 Row / Site for one bundled row per site.
  3. Use the Apply to All controls for shared values such as start date, frequency, engineer, preset, checksheet, and price.
  4. Review the generated rows and save them.

Export current schedules

Use Export in the schedule toolbar. The file is an Excel workbook, not just a plain CSV. It includes the current saved schedules, with multi-equipment and checksheet rotations represented in comma-separated cells where possible.

Download and fill the smart template

  1. Use Template.
  2. Fill or adjust the Schedules sheet. Its columns: Site, Site Reference, Equipment, Equipment Ref, Checksheet, Price, Start Date, End Date, Frequency, Planned Day, Start Time, Hours, Add to Planner, Engineer, Preset, Advance Days, Notes.
  3. Use the dropdowns from Valid Options for frequency, checksheets, engineers, presets, sites, planned day and Add to Planner.
  4. Read the Help sheet before relying on advanced patterns.
  5. Upload the file when ready.

Dates are read in your company's date format (Setup → Accounts Settings), with a four-digit year — "03/12/26" is refused, never guessed. Planned Day: weekly, fortnightly and 3-weekly schedules take Every Monday … Every Sunday; monthly or longer take 1st Monday … Last Friday; blank means each visit goes on its due date. Start Time (for example 09:00) and Hours (for example 1 or 1.5) set the visit's time. Add to Planner = Yes puts every visit on the planner as its job is created — on its Planned Day, at the Start Time, for the Hours, booked to the row's Engineer (it needs one). With Advance Days at 28, four weeks of visits are always on the planner.

To set a whole contract's repeat visits straight onto the planner from one file: fill Frequency, Planned Day, Start Time, Hours, Engineer, Add to Planner = Yes and Advance Days on every row, then upload.

Upload schedule rows from Excel or CSV

  1. Select Upload and choose a .xlsx, .xls, or .csv file (up to 1,000 rows).
  2. The page reads the file and opens a preview — nothing is saved yet.
  3. Check the status dots for site, equipment, checksheet, engineer, and preset matches, and the Day / time and Planner columns.
  4. Read the lines under a row: a red line means the row can't be imported until the file is fixed (it can't be ticked) — for example a site that isn't this customer's, a date that isn't a date, a frequency or a planned day that can't be read, or a planned day that doesn't fit the frequency. An amber line means the row imports but something is left out — for example an engineer, checksheet or preset name that isn't in the account (left blank), or Add to Planner with no engineer (those visits wait in Open Jobs).
  5. Resolve ambiguous site matches from the dropdowns where shown.
  6. Untick any rows you do not want to import.
  7. Select Confirm Import.

The import is all or nothing: if anything fails part-way, nothing is saved and you can simply try again — it never creates the same schedules twice. Names are matched ignoring capitals and punctuation. Multi-equipment values can be entered as comma-separated equipment names, as long as those items belong to the matched site.

Your file in a different layout (another system's export)? Send it to Support — the assistant reads any layout, asks what it needs, shows a preview and imports with your yes.

Use checksheet rotations in the spreadsheet

In the Checksheet column, separate checksheet names with commas, for example Full PPM, Filter Clean. Visit 1 uses the first checksheet, visit 2 uses the second, then the pattern repeats.

For multi-equipment imported rows, the system seeds each visit's checksheets from that rotation so the row is not blank after import. Afterwards, click a visit under the row and use This visit uses if individual equipment need different checksheets or are left off a visit.

Create PPM jobs immediately

Use Create jobs on a saved row, or Create All Jobs (top right of the table) for all saved rows. Create jobs opens the Select Visits to Create list for that schedule's contract term — the same dates the system itself uses — with nothing ticked: tick the visits you want and press Create Selected. Create All Jobs asks how many upcoming visits to create for every saved row, offers the visits of the next 3 months, and says the total before you press it — for example "This creates up to 13 jobs on each of 4 schedules — up to 52 jobs" (a weekly or fortnightly schedule also gets a reminder that it creates each job by itself a few days before the visit). Creation stops at end dates, skips paused schedules, and only creates seasonal visits inside active seasonal months.

Where the new jobs go follows each row's Add to planner tick as it is saved: ticked, each job goes on the Planner on its own date with the row's engineer and time; unticked, the jobs wait in Open Jobs for you to place. Both windows say which before you create anything. In Create All Jobs, if some rows are unticked, a link Tick Add to planner on them first ticks them for you and closes the window — check each row's engineer and time, press the row's Save (✓), then create the jobs. Jobs already created are not moved by ticking it later — use Book selected on the Visits page for those (see the PPM Contracts doc).

There are limits so one click cannot create a mountain of jobs: Create Selected creates up to 500 visits at a time (the button shows the progress), Create All Jobs refuses more than 1,000 jobs in one go ("Create fewer at a time"), and there is a daily limit on PPM jobs created by hand.

In the Create jobs list the top line reads, for example, "8 visits to Wed 31 Mar 2027 · 5 without a job yet · jobs are created unplanned". Past visits are marked Past — overdue but are never ticked for you, so one click cannot create a batch of overdue jobs. On a paused schedule Create jobs just says "Schedule is paused — resume it before creating jobs". If the whole contract is paused, the list opens with an amber line — "This contract is paused — resume it before creating jobs." — and Create Selected stays greyed.

Quote the renewal of several contracts on one quote

When a customer has several contracts (for example one per site) and you quote their renewal together — say as one new contract for every site — mark each existing contract so it no longer looks "still to quote":

  1. Open each contract (PPM/Insp → Open) and go to its Details & billing tab.
  2. Open Renewal status in the Renewal bar and choose Mark as renewal quoted.
  3. The contract shows RENEWAL QUOTED. On the contracts list it moves from the Not renewed filter to Renewal quoted and carries a Renewal quoted tag. No renewal quote of its own is created for it — automatically, or from Create Renewal Quote Now — until you clear the status.
  4. When the customer accepts and the new contract exists, open Renewal status on each old contract, pick the new contract under Mark as renewed, and press Mark as renewed. If the customer says no, use Mark as not renewing or Clear renewal status.

Book, skip or create one visit

Click the visit's cell under its schedule row, then Book / Re-plan (pick the date, times and engineer → Book it), Create the job now, Skip this visit (give a reason) or Put it back. These change that one visit only. Save any change to the row first — while the row has unsaved changes the visit buttons are hidden.

Skip and restore individual visits

The Select Visits to Create list (from Create jobs on a saved row) shows each visit with its status: Pending (past ones are marked overdue), Next, Job exists, Completed, Skipped (fenced), Job deleted, Quote raised, or — on schedules whose next visit counts from the last completion — "After the previous visit is completed".

  • Skip a past visit: tick the "Also permanently skip any unticked past visits" checkbox before clicking Create Selected. Past visits left unticked will then be fenced (permanently skipped). The confirmation dialog lists every date that will be skipped before any change is made.
  • The schedule moves on from the last visit you create, so unticked visits before a ticked one are passed over and are not created automatically. The confirmation dialog lists them so you can tick them too.
  • A visit whose job was deleted shows Job deleted and is not created again.
  • Restore a skipped visit: every Skipped (fenced) row has a Restore button. Clicking it removes the fence so the visit becomes pending again and can be ticked + created normally.
  • Restore only works on visits that were fenced (no job created). Visits that already produced a real job cannot be "restored" — they're already done.

Important Options

  • Start Date is the first due date anchor. Before any job has been generated, changing it can also re-anchor the next visit date.
  • Frequency controls how many visits per year are generated. Seasonal bands can replace a single frequency with different frequencies by month range.
  • Planned Day can snap visits to a weekday or an ordinal weekday, such as first Monday or last Friday.
  • Starts … lasts … h … ends (in the Planned Day & planner column) — when a visit starts and how long it lasts. Type a length (for example 1 for one hour) and the end time fills itself in; type an end time instead and the length clears. Leave both the length and the end empty and each visit is timed by the job's own length (the job preset, the PPM minutes per piece of equipment in PPM/Insp Checks Setup, or the job category). The length you type also becomes each job's planned hours. The same start and end are the default time when you book a visit on the Visits page.
  • Add to planner — ticked, each job goes on the Planner Board on its due date (moved to the Planned Day when one is set), with the row's engineer, at the row's time. It needs an engineer on the row (an amber warning says so). The line under the tick says in words where the row's jobs go.
  • Let the assistant plan these — shown only when the company's AI assistant plans (AI Planner Settings → Who plans). Ticked instead of Add to planner, each job is created unplaced and the assistant puts it in its due week, choosing the day, the time and the engineer with the shortest routes it can. Under it, Any of these engineers limits who it may choose (none ticked = anyone suitable; a single engineer on the row with none ticked = always that engineer). The two ticks are either / or.
  • Certificates (its own column, right after Checksheet) — the certificates the row's jobs can carry, listed open. For each piece of equipment lists certificates set to cover each unit (Certificates → template → This certificate covers): green when it covers that equipment's type, amber when it covers only some of the row's equipment, and red under Other certificates when it covers none of it (the job would carry a certificate waiting for equipment). For the job (one certificate) lists whole-job certificates, green when they are linked to the job category. Nothing is ticked for you. Tick one and choose On visit (the visit numbers of the row's checksheet cycle — for example the annual gas certificate on visit 4 of 4); untouched, it goes on every visit. A per-equipment certificate covers every matching unit on the job; a unit that doesn't need one is marked Not applicable on the job. Press the row's Save (✓) to keep the choice. Renewing the contract copies it. Deleting a certificate template removes it from the schedules that used it (the Certificates list shows On N PPM schedules first).
  • Job Preset pre-fills generated jobs with selected preset values, materials, notes, compliance items, certificates, risk assessments, additional engineers, and other configured preset content.
  • A job preset chosen for a visit in the Schedule Builder that has since been deleted shows as Name (deleted) in red, and the row's Schedule Builder summary counts it. Jobs for that visit use the schedule's own preset until another is chosen (no preset, if the schedule's own one was deleted too). Job Presets shows where each preset is used in PPM, can move those schedules to another preset when you delete one, and lists deleted presets that PPM schedules still use so they can be moved.
  • In Create jobs, a contract's last visit can show Moved from … — the contract ends this day (Setup → PPM/Insp Checks Setup → Renewals → Create a contract's last visit on its end date is on), or After the contract ends — not created (that switch is off).
  • Multi-equipment schedules can either use a total schedule price or per-equipment pricing depending on the row's pricing mode.
  • Create days before (the days before due box under the start date) controls how far ahead of the due date the job should be created. New rows start at your company figure from Setup → PPM/Insp Checks Setup (14 days unless you changed it); a blank Advance Days cell in an uploaded spreadsheet uses it too.
  • Due action on a row (or the contract default) chooses create job, create quote, or job + invoice — not the same as contract auto-invoicing.
  • Floating cadence sets the next due from each completion instead of a fixed calendar grid.

Spreadsheet Limits

The spreadsheet is for bulk schedule creation and straightforward edits. Finish these advanced cases in the Schedule Builder after import:

  • per-equipment per-visit checksheets
  • skipping a specific equipment item on a specific visit
  • per-visit job preset overrides
  • per-equipment price splits when the spreadsheet used a total row price
  • seasonal bands
  • Let the assistant plan these (where your company has it)

Common Mistakes

  • Expecting the Template button to create jobs. It only downloads a workbook for bulk schedule setup.
  • Uploading a spreadsheet and skipping the preview checks. Always resolve ambiguous site or equipment matches before confirming.
  • Using the spreadsheet for advanced per-visit exceptions. Import the main pattern, then adjust single visits under the row (This visit uses).
  • Forgetting that multi-equipment spreadsheet imports treat the Price column as the per-visit total for the row.
  • Clicking Create All Jobs before reviewing saved rows, pause flags, seasonal bands, and end dates.
  • Confusing Renew Contract with adding future visits. Renew starts the next term; Create jobs / Create All Jobs create jobs from existing schedules. After a late renewal, a copied schedule whose first visit date has already passed is left paused (its band says Paused) and creates no job until it is resumed — check its dates first.
  • Ticking PO mandatory for this contract and expecting visits to stop being created. It never blocks a visit — it only flags visits without a Customer Ref / PO with a red "Missing" box and stops an invoice being created from the job, or emailed, until one is entered.
  • PPM Contracts — list of contracts and entry point to this workspace.
  • PPM/Insp Checks Setup — checksheet design, auto-linking by equipment type, numbering, pause policies, defect settings.
  • Equipment Setup — equipment types used for checksheet suggestions; Requires PPM flags uncovered assets on the Equipment list.
  • Equipment — asset register with PPM column/filter and per-asset PPM Schedules panel linking back here.
  • Sites and Equipment — master data used by schedules and spreadsheet templates.
  • Job Options — job presets used by generated PPM jobs.
  • Planner — where generated planner-enabled jobs appear.
  • Invoices — invoices created from contract billing.