What This Area Is For
Configures the Projects module: whether it is on, how projects and their jobs are numbered, the statuses and types available, the document folders on every project, the working calendar the Gantt uses, health rules, commercial defaults, which tabs projects show, your own project fields, and the reusable plan and PDF templates. Every change saves as you go (green flash = saved).
What You'll See
Projects module switch — turns the Projects nav item and the project hub on or off. Shows how many projects and project jobs exist, plus a count reading "N main job(s) with linked jobs (not projects)" — hover it for the tooltip "Main / Linked job groups on the Jobs page — separate from projects". Those are job groups on the Jobs page, not projects.
Numbering
- Project numbers: Own sequence with prefix (e.g. P-0001; prefix and start number editable) or Share the job number sequence (a project is simply the next job number — "Project 3357").
- Jobs inside a project: Independent (normal job numbers, just linked), Suffix (P-0001-A, -B…), or Slash (P-0001/1, /2…).
Statuses — add, rename, recolour, reorder (drag) and delete. Each status belongs to a stage group the system keys on: pre-award (projects can exist before a quote is won — surveys, tenders), live, commissioning, complete, closed, cancelled. Closed/cancelled projects drop off the default list; complete/closed set health to Complete. One status is the default for new projects. Deleting a status in use asks where to move those projects.
Project types — Installation, Refurbishment, Design & Build… each can point at a default plan template.
Plan templates — link to the template editor (below) and to PDF layouts.
Document folders — the folders on every project's Documents tab, with a default visibility (internal / customer), New files visible to engineers (off by default — a file shown to engineers appears on every job of the project in the engineers app and on the engineers website; each file can still be changed on the project's Documents tab) and a required for handover flag that feeds the Handover checklist. A plan template's own folders have the same eng. tick. Folders holding documents cannot be deleted.
Working calendar — which weekdays count for task durations and dependency pushes; skip bank holidays (uses your holiday region); pull successors earlier (MS Project style — off means dependants only ever move later); extra non-working dates such as shutdowns.
Health rules & defaults — days late before a project is At risk; default retention %; default defects period; which ticket category counts as a snag on the Handover tab; whether jobs on a project show their project number on the planner.
Project tabs — "Switch off the tabs you do not use and they disappear from every project." Nothing is deleted, and Overview is always on. There is a tick for Plan, Tasks, Jobs, Money, Purchasing, Materials, Documents, Safety, Handover, Tickets and History, plus one for each of your own sections that shows as its own tab. Each tick saves at once — "Saved — N tabs switched off." or "Saved — every tab shows." A link to a tab you have switched off opens Overview. This card works whether or not your own project fields are switched on.
The same card sets the order of the tabs: drag a tab by its grip handle (the dotted bar at its left) and drop it where you want it. It saves at once ("Saved — projects show the tabs in this order.") and every project shows the tabs in that order, for everyone in the company. Your own sections can go anywhere, before or after the built-in tabs. Overview always stays first. Put the tabs back in the usual order (under the card, shown once you have changed the order) undoes it. A tab added later — a new section of your own that shows as a tab, for example — goes straight after the tab it normally follows. Someone who cannot see project money simply does not see the Money tab; the rest keep your order.
Your own project fields — "Add the things you track on a project that are not already here — a panel status, a software version, a witness date…" The Design your fields button opens the field builder (you need access to project settings). The card has a switch, with the tooltip "Show your fields on every project", that is off by default. While it is off the card reads "N sections · N fields · switched off — projects do not show them yet" and the project page is unchanged; you can still design your fields before you switch it on. The builder page, titled Your own project fields, has:
- New section — a section has a name, an icon and where it shows on a project: Its own tab, A card on Overview, A card on Handover or A card on Money (Money cards are only for people who can see project money). Which projects — every project, or only the project types you choose. Show this section — Always or Only when….
- Add a field — the kinds are Short text, Long text, Number (unit, decimals), Money, Percent, Date, Yes / No, Pick from a list (coloured choices), Stage tracker and Link to a record (Customer, Supplier, Office user or Engineer). Each field can have help text, Required (No / Always / Only when…), Show this field (Always / Only when…), Take it from the plan (a date, days, number or percent read from a plan task or phase, so it is never typed twice) and Show it in the project header (up to 6 fields). There is also a live Try it preview.
- Upload your field list — a .xlsx, .xls or .csv with headings such as Section, Field name, Type, Options, Mandatory and Notes. You get a review first, then Create N fields.
- Removing a field only archives it.
A required field that is empty shows red, and appears under Needs attention on the project; it never blocks a save.
The page also has a My tasks — where people see them card with two ticks, both on by default — "My Projects" tile on the admin dashboard and Engineers see tasks assigned to them — and a How Projects work card.
Plan Templates
A template is a whole plan stamped onto a project in one click: phases; tasks and milestones with offset (working days from the project start), duration, a predecessor with link type and lag; checklist items (no dates — the office action list: kit ordered, kit delivered, hire ordered…); an auto-complete rule and what it watches (certificate type, document folder); whether the task creates a child job (with category) when applied; whether it is assigned to the PM; a budget cost. Plus required document folders, required certificate types, and invoice stages (deposit, milestone-triggered, % complete, date, retention release — with % of contract and whether retention is deducted). Add starter template creates an editable installation-project example. Templates can be duplicated and set as the default for new projects.
Project PDF templates
Layouts for the Project Plan, Order Acknowledgement, Site Safety sheet and Handover index. Choose which blocks print and in what order (drag): company header, title, intro text, project summary, customer, site, contacts, scope, contract value, agreed works (from the source quote), invoice schedule, invoice tracker, variations, cost summary, phases, milestones, task list, Gantt chart, jobs, certificates, handover checklist, documents index, site safety info, emergency contacts, RAMS list, notes, signature block, terms, page break. Only blocks placed in the template are printed. Accent colour, landscape and "show money blocks" are per template. Under the layout, a Preview shows the printed document for one of your projects, drawn from the layout as it stands on screen (it updates as you change it, without saving). It appears once your company has at least one project.
Common Tasks
Switch the module on for the first time
- Turn on Projects module. Default statuses, types and document folders are created.
- Choose your numbering.
- Set the working calendar and defaults.
- Open Manage templates → Add starter template, then edit it to match how you run an installation.
Add a "Snagging" status
Statuses → Add → name it, choose stage group complete, pick colours, save.
Add your own fields to every project
- In the Your own project fields card, click Design your fields.
- Click New section, give it a name and an icon, and choose where it shows on a project.
- Click Add a field for each thing you want to track — or use Upload your field list to start from a spreadsheet.
- Switch on the card's switch ("Show your fields on every project"). Until then projects look exactly as before.
Common Mistakes
- Renaming a status but forgetting the stage group — the name is yours; the group is what drives behaviour.
- Deleting a document folder that a template lists as required — remove it from the template first.
- Expecting the calendar to change engineer diaries — it only affects plan maths on the Gantt.
- Designing your own fields and not seeing them on projects — the switch on the Your own project fields card is off by default; until it is on, projects do not show them.
- Expecting Project tabs to delete anything — switching a tab off only hides it on every project; nothing is deleted, and Overview is always on.
Asking the assistant
The assistant on your Help & requests page (Support, under your initials) can read this page and change it with you: the module's settings, your project types and statuses, your plan templates and your own project fields, and the document folders new projects get (name, whether customers can see it, whether engineers see new files, needed for handover, which project types get it, the order — deleting one moves its files on projects to Unfiled, nothing is lost). It tells you what you have now, says the change in plain words and saves only after you say yes; deleting anything is always shown to you first. Who can open a folder person by person stays with you (the folder's Access button), as do a single project's own folders.
Related Areas
- Projects — the list and project hub.
- Accounts Settings — holiday region used for bank holidays.
- Ticket options — categories available for the snag category setting.