What This Area Is For
PPM/Insp Checks Setup is where you design and manage checksheets — the forms engineers complete for planned maintenance (PPM) and inspections — and where you configure account-wide PPM behaviour: certificate numbering, how completed PPM PDF files are named, whether PPM generation pauses for certain customer states, which summary a new template starts with, defect tracking, automatic checksheet suggestions by equipment type, and whether the customer, site and equipment on PPM jobs are locked to the schedule.
The page opens with a short guide to how checksheets work. The two PDF outputs — a certificate per equipment from the checksheet, and a whole-job cover sheet from the Job PDF Template — are explained in the How it works panel on PPM/Insp (Contracts).
Renewals decides what Renew Contract, or applying an accepted renewal quote, does. Automatic — a contract with an end date gets a new contract for the next term; an open-ended contract is extended in place. Always extend keeps the same contract and moves the end date on. Always a new contract starts the next term as its own contract. The renewal dialog shows what will happen and lets you choose differently for that one renewal. The old contract is marked Renewed and finishes its own term. It is not paused, and nothing is created after its end date. On a new contract, a copied schedule whose first visit date has already passed (a late renewal) is left paused so the office can check its dates before any job is made. A renewal keeps each schedule's Schedule Builder (the checksheet for each unit on each visit and the job preset per visit), including when the renewal quote changes which checksheet is priced on a visit; it is only left behind when the quote changes how many visits the schedule has, and the renewal notes say so.
Create a contract's last visit on its end date (under Renewals, off unless switched on): nothing is created after a contract's end date. When a schedule's dates leave a contract one visit short because its last visit falls just after the end date — for example visits on the 31st and a contract that ends on the 30th — switching this on creates that visit on the contract's last day. Only that one visit moves; the schedule keeps its usual dates, and a visit that belongs to the next contract is never moved. The Create jobs list on a schedule shows which visit this applies to, and says when it is not being created because the switch is off.
New schedules create each job this many days ahead (under Renewals, 14 unless you change it): a schedule creates each visit's job by itself this many days before the visit, so it shows in Open Jobs — or on the planner, if the schedule puts it there — in time to see it coming. 0 means on the day itself. This is the starting number for a schedule row you add in a contract's Schedule Builder (Add Row, Quick Add, a Regular visits plan, or an uploaded spreadsheet whose Advance Days cell is blank); each schedule then keeps its own number in its row's days before due box.
Outcome and severity model (current)
Each answer option counts as one of four outcomes — Pass, Fail, Advisory and N/A. When Defect Tracking is enabled, defects use exactly 3 severity levels:
- Critical
- Advisory
- Observation
Admins can still customize each level's label, badge colors, and behavior flags (for example immediate action and office notification), but they cannot add extra severity levels or delete the three core ones. Manage them from Labels & Colours.
The result is worked out from the checksheet as it is now. The engineer's answers are saved as they gave them; whether each one is a Pass, Fail, Advisory or N/A comes from the option's Counts as (or a reading's pass band) on the checksheet at the moment the report is made. So when a result looks wrong — an answer that should be a pass printed as a fail — look at how that option counts on the checksheet first. Change its Counts as, then make the PDF again: every report built from then on scores the same saved answers the new way, without anyone touching what the engineer entered.
What You'll See On This Page
Top of the page
- The main title PPM/Insp Checks Setup and short subtitle about managing checksheets.
- Two prominent links: PPM Contracts (manage contracts and visit schedules) and Labels & Colours (outcome and severity labels used when defect tracking is on).
“How PPM Checksheets Work (Current Flow)” guide
A guide panel under the title. An opening line says to build your checksheet once, assign it to PPM contracts, and have engineers complete it on each visit; defects logged from those checks are tracked per equipment and can carry forward to future visits when that is enabled. Then:
- Four numbered cards — Create checksheet (Simple Builder is recommended; Advanced Canvas is for complex layouts), Link equipment types (tag checksheets to equipment types so scheduling can auto-suggest the right one), Assign in contracts (attach checksheets to schedules in PPM Contracts) and Complete on visit (engineers fill the check, log defects, and carry unresolved items forward when enabled).
- Outcome and severity model — a box saying each answer option counts as one of four outcomes (Pass, Fail, Advisory, N/A) and defects use three severity levels (Critical, Advisory, Observation); you can rename and recolour them in Labels & Colours, but not add or remove them.
- Settings on this page — four small cards (PPM Numbering, Auto-Pause Policies, Defect Tracking, Auto-Link by Type) saying what each setting below does.
- Quick tips — Duplicate (use Copy to create variants quickly), Force Complete (set per checksheet), Service levels (keep separate checksheets for quarterly and annual visits) and AI assist (use template builder mode for first drafts, then refine manually).
Combined settings card
A single white card containing several sections separated by horizontal rules:
- PPM/Insp Numbering — shows current prefix, start number, and next certificate reference. An Edit control reveals a form: optional prefix, start number, Save / Cancel. Help text explains leaving the prefix blank for numbers-only references, and that the start number sets the next number to issue but never drops below a number already used.
- PPM PDF Filename — how completed PPM PDF files are named. Type a pattern or click the tokens {customer_name}, {site_name}, {job_number}, {ppm_number}, {equipment_name} and {date} (the completion date, in your date format); a live Preview shows the result, and the section has its own Save. Leave it blank for the default (
PPM_followed by the PPM number). The PPM number is always part of the name so every file stays unique: if your pattern does not include {ppm_number}, the number is added to the end — even when the same digits happen to appear elsewhere in the name, for example inside the date. Only letters, numbers, dots, dashes and underscores are kept; spaces and other characters become_. Email attachments use the same name. It applies to PPMs completed or regenerated from now on — existing PDFs keep their name until they are regenerated.
- Auto-Pause PPM/Insp by Customer Status — four toggles with plain-language labels: Ceased Trading, Cash Only (shown with your company's own name for that tick when you gave it one in Customer Options, e.g. Proforma Only), On Hold (an admin manually ticked On Hold on the customer), and Credit Limit Exceeded (the customer was put on hold automatically because their outstanding balance went over their credit limit — set in Invoice Settings or per customer). When enabled, each switch pauses automatic PPM/inspection job generation for customers in that state (contracts can still be paused manually). All four are ON by default. Turn Credit Limit Exceeded off if you want to keep servicing a customer's equipment while you chase payment; the hold itself clears automatically once the balance drops back under the limit. A Save Pause Policies button applies changes.
- Default Template Mode — a dropdown that decides which summary is switched on for brand-new PPM/Inspection templates: Both — Results Summary + Defects Summary, Pass / Fail — Results Summary only or Defect Tracking — Defects Summary only. You can always change it per template. It saves as soon as you pick one. The page notes that most companies pick one or the other, because both in the same PDF can confuse customers.
- PPM/Insp Defect Settings
- Enable Defect Tracking — master switch so engineers can mark individual form answers as defects. Toggling submits the form immediately.
- Carry Forward Defects — when on, engineers see previous unresolved defects when starting a new visit on the same equipment, and give each one an answer — Still Open (still there), Resolved (fixed) or Couldn't check (could not get to it on this visit, with an optional reason) — before the checksheet can be completed. The same rule applies in the engineer app, on the office completion form (where the buttons read Copy to This PPM, Mark Resolved and Couldn't check) and in the admin app. Also saves on toggle.
- Compliance types — a panel (not a toggle) saying you can define what each asset must have done and how often (an inspection every 12 months, a periodic test every 5 years…); each asset then gets its own next-due date per requirement, worked out from its own results and certificates. It is optional — nothing changes until you add one. Manage types opens the list.
- Auto-Link PPM/Insp Checks by Equipment Type — when on, the schedule builder suggests checksheets that match the selected equipment’s type. Saves when you flip the switch.
- Lock Customer, Site & Equipment on PPM Jobs — when locked, the customer, site and equipment on a PPM job are set by the schedule and cannot be changed on the job; when unlocked, you allow on-the-fly changes (for example moving a one-off visit to a different site, or attaching extra equipment). Saves on toggle.
- Renewals — the three renewal choices, Create a contract's last visit on its end date and New schedules create each job this many days ahead, described at the top of this page. The renewal choices and the last-visit switch save as soon as you change them; the days-ahead box has its own Save button.
Create checksheet
- A primary button Create PPM/Insp Check opens a modal with two choices:
- Simple Builder (Recommended) — form-based sections and fields; quickest for most teams.
- Advanced Canvas Designer — full drag-and-drop layout for complex or heavily branded PDFs.
Simple Builder — Answer Rules (follow-ups + per-answer defects)
Inside the Simple Builder, any field with a fixed set of answers — Yes/No, Dropdown, or Radio — gets an “Answer rules” panel underneath the basic field settings. This is where two powerful features live:
- Follow-up questions (branching) — attach extra questions that only appear when the engineer picks a specific answer. For example, a "Is the extinguisher damaged?" field can have a follow-up "Describe the damage" that only shows when the answer is Yes. Each answer gets its own "+ Follow-up" button; click it to add a dropdown, yes/no, radio, text, or number child. Dropdown, Yes/No, and Radio follow-ups can themselves have more follow-ups, so branches nest freely. Children of type text or number are leaves (no further rules).
- Per-answer defect rules — next to each answer is a "Log defect" dropdown with three modes:
- No — picking this answer never prompts a defect.
- Optional — engineer sees a "Log defect" button but can skip it.
- Required — engineer MUST log a defect before the sheet can be submitted.
Once an answer's mode is Optional or Required, three more options show under it: Severity (preselected on the defect, or Engineer picks), Photo required and Action (Hidden / Optional / Required). With Photo required ticked, a defect logged against that answer needs at least one photo: the engineers app won't save the defect without one, and the engineers portal, the office completion form and the admin app stop Save Progress / Save draft and Complete with "Photo required — This check requires a photo of the defect before saving." on that defect until a photo is added. The same tick on a number's out-of-range rule or a Data Table column's rule works the same way. Defects the rule files automatically (Auto) are never held up.
Example: on a "Pressure gauge in range?" Pass/Fail field, set Fail → Required so engineers can never walk away from a failed check without recording the problem.
Use branching and per-answer defects together to turn a flat paper checklist into a smart flow: a Fail answer pops the follow-up question and forces a defect, an N/A answer does nothing, and a Pass just moves on.
A few things to know:
- Branching + defect rules only apply to Yes/No, Dropdown, and Radio fields. Plain text, number, textarea, photo and signature fields have a single "Defect tracking" toggle instead of per-answer rules.
- Defect severities (Critical / Advisory / Observation) are set globally under PPM Defect Severities — the engineer chooses the severity when logging the defect on the job, so you do not pick it on the template itself.
- Renaming the Yes/No buttons (see presets below) does not break branching or defect rules — they still follow the Yes / No / N/A side of the buttons, even if the labels are renamed.
- The Defects Summary panel on the PDF (toggled in the right-hand layout rail) lists the defects by what happened on that visit — found on this visit, still present (with when each was first reported), fixed on this visit and not checked on this visit (with the engineer's reason) — each with its severity; when every defect was found on that visit it stays a single list. The Results Summary counts pass/fail/NA and prints the overall result. You can have either, both, or neither.
- Photos on the PDF are the ones taken on that visit. A photo from an earlier visit only appears beside a defect the engineer confirmed as still present, marked as from that earlier visit.
- Photo notes (a Photo field's settings, all off until you tick them): Engineers can add a description to each photo and Engineers can tag photos Before / After let the engineer long-press a photo in the app (or use Add note under it on the web form) to describe it and tag it. What the PDF prints is separate: Print the description under each photo, Print the Before / After label, and Print Before photos first, then After. A checksheet you never tick these on prints exactly as before. Changing a note on a completed sheet refreshes its PDF within a couple of minutes (only when that photo field prints notes).
Required questions and the INCOMPLETE result
Any question can be marked Required in the builder. What happens when one is left blank:
- Engineer app and admin app — Complete lists the blank required questions. The engineer can go back and answer them, or choose Complete anyway.
- Office completion form — the form will not submit until the required questions are answered.
The Results Summary then reads FAIL if any check failed; otherwise INCOMPLETE (amber) when required questions were left blank, with a line saying how many; otherwise PASS. A question hidden by Show only if..., a follow-up whose answer was not picked, and the date the system fills in itself never count as blank.
If a required question only applies some of the time — for example heating readings on a unit that was running in cooling — untick Required on it, or give it a Show only if... condition so it only appears when it applies. Otherwise every visit where it does not apply prints INCOMPLETE.
Usual frequency (when this check is next due on equipment that is not on a schedule)
In the checksheet's builder (Simple or Advanced), under the Unable to complete settings, Usual frequency says how often this service is normally done — the same list as a PPM schedule row (Weekly … 5 Yearly). It is blank to start with, and blank changes nothing. When it is set, equipment that is on no PPM schedule for this checksheet gets a Next <checksheet> due date: the last time the check was completed plus that frequency. Equipment on a schedule follows the schedule's own frequency and dates — the schedule wins. Each completed check keeps the next-due date it was given when it was completed (a reprint never changes it), and the checksheet's Next Due (auto) date field prints that same date once a Usual frequency is set. Show the dates on the equipment record from Equipment Setup → Automatic fields, or print them with the Next … due tags on your PPM check, job, quote and certificate templates. Copy keeps the Usual frequency.
Unable to complete (a whole checksheet that could not be done)
Sometimes the work on a unit cannot be done at all — no access, no traffic management, unsafe, the equipment has been removed. A checksheet can let the engineer say so instead of leaving it blank:
- In the checksheet's builder (Simple or Advanced), beside Force Complete, tick Engineers can mark a sheet Unable to complete. Then choose Photos required (Optional or 1–6 photos the engineer must add), Produce a PDF for it, Print the photos, and the PDF heading and PDF message. The Simple Builder can Preview the PDF as an Unable to complete sheet. A checksheet you never tick works exactly as before.
- Reasons a checksheet could not be completed (on this page): a list of ready-made reasons (for example No traffic management, No access) that the engineer can tap. Add, rename, reorder or remove them here. They always type a reason too — tapping a ready-made one fills it in. Leave the list empty and they just type it.
- What the engineer sees: an Unable to complete button at the top of the checksheet in the engineers app, the engineers portal and the office completion form. They give the reason and any photos, and the sheet turns red with the reason. It works offline. Undo puts the sheet back to not started; completing the checksheet later replaces the mark.
- The job can still be completed — a checksheet marked Unable to complete counts as dealt with for Force Complete. The visit counts as done, but the unit stays due: its PPM due date does not move on, and on the PPM year grid it shows as not done.
- The office sees a red Unable to complete badge with the reason on the job, on PPM Results and on the visits board (filter Unable to complete). Create revisit quote on the job's PPM row starts a quote for that unit whose first line says which checksheet could not be completed and why.
- The PDF (only when Produce a PDF for it is ticked): your document header, customer, site and equipment details, then the heading, message, reason, who recorded it, when, and the photos — no questions. It gets a PPM number and goes with the completion email like any other PPM certificate.
- Automations: the job facts PPM checksheets unable to complete (a count) and Unable to complete reason let a rule email the office or create a follow-up when a visit could not be done.
Simple Builder — Yes/No field labels (customisable)
When you add a Yes/No field in the Simple Builder, each field has a Label preset selector so you can choose how the two buttons are worded on the engineer app, the completion form, and the final PDF — without creating a different field type.
- Presets available: Yes / No (default), OK / Not OK, Pass / Fail, Good / Bad, Acceptable / Not Acceptable, Compliant / Non-Compliant, Satisfactory / Unsatisfactory, Working / Not Working, and Custom.
- Custom lets you type any two labels (for example “Present / Missing” or “Clean / Dirty”). Custom labels must be non-empty.
- Allow N/A toggle per field still works as before — when enabled the engineer sees a third N/A button.
- Labels are display-only. Button labels are what engineers see; reports, defects, and follow-ups still treat the answer as Yes, No, or N/A. This is deliberate so:
- Defect tracking keeps working — a No-side answer is still eligible to be marked as a defect regardless of the button label.
- Branching logic (follow-on questions under Yes / No) keeps working across renamed fields and historical data.
- Results summaries and reports continue to read Yes / No / N/A consistently across checksheets.
- Where the custom labels appear: builder preview, engineer mobile app buttons, admin completion form buttons, and the final PPM PDF (including pass/fail colour coding — the PDF recognises the preset aliases so “Pass” stays green, “Fail” stays red, etc.).
- Existing checksheets keep Yes / No until you change the preset, and behave exactly as before.
Simple Builder — Number fields (unit + pass band)
On a Number field you can set:
- Unit Suffix (for example °C, kg, bar, PSI) — shown next to the reading on the app, office form, and PDF.
- Pass band — optional min / max. Inside the band passes; outside fails. Leave both blank to leave the reading unscored. You can set just one side (a minimum only, or a maximum only).
- Warn band (appears once a pass band is set) — an optional outer min / max. A reading outside the pass band but still inside the warn band is an Advisory (amber) rather than a Fail (red). Readings outside the warn band fail. Leave it blank for a plain pass/fail band.
- If out of range — log defect (only once a pass band is set) — No, Optional, Required, or Auto (created for the engineer). Optional and Required work like the per-answer defect rules (severity, Photo required, Action). Auto is different — see below.
The engineer app and the office completion form colour the reading live (green / amber / red) as it is typed, and the Results Summary on the PDF counts the outcome automatically.
Simple Builder — Data table columns (pass bands + calculated columns)
A Data table field is a grid the engineer fills in row by row — for example a water meter test with columns for Reference meter reading, Meter under test, and a calculated % Difference. Under each column heading you can type a short unit (PSI, °C, %). Wide tables shrink to fit on the PDF, then split columns only if they still will not fit.
Number and Calculated columns can carry the same Pass band / Warn band as a number field, so each cell is scored as it is entered:
- The cell tints green / amber / red live in the app and on the office form, and a PASS / ADVISORY / FAIL pill above the table shows the worst cell.
- Band bounds on a column may be plain numbers or reference one of the table's constants (for example
0 - tolandtol, where tol is a "Tolerance %" constant the engineer can adjust on the day). The builder shows which constants you can use. - The Results Summary on the PDF counts every banded cell, and each cell keeps its colour on the certificate.
- Rows without a value in a banded cell are simply unscored — they do not fail.
Banded columns get the same If out of range — log defect rule as number fields. When the rule is Optional or Required, an out-of-range cell shows a small Report defect prompt on that cell; a Required cell without a defect blocks completion. Each defect remembers which row and column it came from, so a table with three flow tests can carry three separate defects.
Auto defects (created for the engineer)
Choosing Auto (created for the engineer) on a pass band makes the system raise the defect itself:
- The moment a reading (or table cell) is out of range, a defect appears with a Fail severity you choose. If the field has a Warn band, you can also set an Advisory severity for amber readings — leave it as None (fail only) to only raise defects on a fail.
- Defect text is a template with placeholders —
{label},{value},{unit},{min},{max}and, on table columns,{row}— and the builder shows a live example. Leave it blank for a sensible default such as "% Difference 3.4 % outside 0 – 2 % (Low flow)". - If the engineer corrects the reading back into range, the auto defect is withdrawn again. If the value changes but is still out of range, the defect text and severity refresh.
- The defect text and severity belong to the rule — the engineer cannot rewrite or delete an auto defect, but can still add photos and pick an Action (Repaired / Action required…) when the Action option is on. Defects the engineer logs manually are never touched by the rule.
- The rule is also applied when the office saves the sheet.
Readings history
Every numeric answer with a pass band — number fields and banded table cells — is kept per piece of equipment. On the equipment record in the admin portal, a Readings History card (below PPM Check History) shows each reading line with its latest value and outcome, the trend since the previous visit, min / max, the pass band, and a small sparkline of recent readings, each linking to the job it came from. Table readings are tracked per row label (for example Low flow — % Difference), so a meter's low-, mid- and high-flow tests trend separately.
In the engineer app, the previous visit's value shows as Last: … ghost text inside the empty field or cell (and under number fields with the date), so the engineer can see drift at a glance before typing.
The full history can also be shown in the engineer app: switch on Equipment History in App Settings › Job Screen Layout (off by default). Each unit's Readings history (the same lines, values, outcomes, changes and charts as the office card) and its PPM check history (the last 12 checks, with their PDFs) then appear directly above the checklist on the PPM screen, and under History on the job's equipment card. Two ticks under the switch choose the readings graph and / or the check history. It comes with the normal sync, so it works with no signal. Engineers also need Can view equipment history (Staff › engineer permissions, on by default). The Field Ascend Admin app shows the readings card above the form on its PPM screen too.
Checksheets table
Lists every checksheet with columns:
- Checksheet Title
- Builder — badge showing Simple or Advanced
- Equipment Type — types the checksheet applies to (or “N/A” if none)
- Job Category — a label on the checksheet (PPM visit lists can be filtered by it). It does not put the checksheet on jobs of that category: a checksheet reaches a job from a PPM schedule, from a job preset that carries it (each machine on the job gets one checksheet, matching its equipment types, and a machine that already has one keeps it), or by being attached on the job. Compliance checks are the forms that attach to jobs automatically by job category.
- Force Complete — Yes if the job cannot be completed until this checksheet is completed
- Unable to complete — whether engineers can mark this checksheet Unable to complete (and how many photos they must add)
- Actions — Edit (opens the matching builder for that checksheet), Copy (duplicate with “(Copy)” in the title), Delete (with confirmation)
If there are no checksheets, you see an empty state inviting you to create the first one.
What You Can Do Here
- Read the in-page guide for the build, link, assign and complete flow — and the How it works panel on PPM/Insp for the two PDF outputs (a certificate per equipment, or a whole-job cover sheet).
- Configure how PPM/Insp reference numbers are formatted and how the next number advances.
- Choose how completed PPM PDF files are named (a pattern built from customer, site, job number, PPM number, equipment and date).
- Decide whether PPM job generation should auto-pause when customers are ceased, cash-only, manually on hold, or automatically on hold for exceeding their credit limit.
- Turn defect tracking and carry-forward on or off for the whole account.
- Enable or disable auto-linking checksheets by equipment type when building schedules.
- Choose which summary new templates start with (Default Template Mode).
- Choose whether the customer, site and equipment on PPM jobs are fixed to the schedule or editable on the job.
- Create, edit, duplicate, and delete checksheets. Delete only works on a sheet that nothing uses — no PPM schedule, equipment on a schedule, job preset, compliance type, PPM quote, task, completed check or recorded defect. A completed check is printed from its sheet, so a sheet with history is never deleted; the message says what still uses it. To retire a sheet that has history, rename it (for example "Old — Boiler service") and untick its equipment types so it is no longer picked.
- Ask the assistant (Help & requests, or the assistant panel on this page) to build or change a checksheet: it opens a card where each version it saves is printed — on your latest completed check of that sheet, or on sample answers when there is none — so you see the PDF before you put it live by equipment type. It can also copy a sheet, delete one nothing uses, and explain your PPM setup (which sheets are used where, how a visit becomes a job).
Common Tasks
Issue professional certificate numbers
- In PPM/Insp Numbering, click Edit.
- Set an optional prefix (for example
PPM) and the start number if you are beginning a new sequence. - Save. Confirm the Next PPM/Insp preview matches what you want printed or emailed going forward.
Name PPM PDFs after the customer and date
- In PPM PDF Filename, click the tokens you want (for example {customer_name}, {ppm_number} and {date}) or type the pattern.
- Check the Preview underneath.
- Click Save. PPMs completed from now on use the new name, including on email attachments; regenerate older PPMs if they should be renamed too.
Pause compliance work automatically for risky accounts
- Under Auto-Pause PPM/Insp by Customer Status, enable the switches that match your credit and trading policies.
- Save Pause Policies.
- Remember that manual contract pause is still available in PPM Contracts regardless.
Turn on defects for service quality tracking
- Enable Enable Defect Tracking.
- Optionally enable Carry Forward Defects so repeat visits show open findings — engineers then answer each one (Still Open, Resolved or Couldn't check) before completing.
- Open Labels & Colours from the top bar to tailor labels/colors/flags for the three fixed levels.
Build your first checksheet
- Ensure equipment types exist under Equipment Setup if you will link by type.
- Click Create PPM/Insp Check and choose Simple Builder unless you know you need the advanced canvas.
- Name the checksheet, link the relevant equipment types, and add sections/questions.
- In PPM Contracts, attach that checksheet to schedules for the right visit pattern.
Clone a seasonal or “gold standard” form
- Find the existing row in the table.
- Click Copy and confirm.
- Edit the new “(Copy)” checksheet to adjust wording or intervals.
Add a follow-up question that only appears for a specific answer
- Open the checksheet in the Simple Builder.
- Find the Yes/No, Dropdown, or Radio field you want to branch from.
- In its Answer rules panel, click "+ Follow-up" next to the answer that should trigger the extra question (for example next to No).
- Pick the child type — dropdown / yes-no / radio / text / number — and type its label.
- If the follow-up itself has answers (dropdown / yes-no / radio), you can add its own follow-ups from its nested Answer rules panel.
- Save the checksheet.
Force an engineer to log a defect when a check fails
- Enable Enable Defect Tracking in the defects settings card above.
- Open the checksheet in the Simple Builder.
- Find the Yes/No, Dropdown or Radio field where a bad answer should require action.
- In its Answer rules panel, change the Log defect dropdown next to that answer to Required (or Optional if it's discretionary).
- Save the checksheet. From now on, picking that answer in the engineer app prompts — or insists on — a defect entry, using the severities you configured under PPM Defect Severities.
Let engineers mark a checksheet "Unable to complete"
- Open the checksheet in its builder.
- Beside Force Complete, tick Engineers can mark a sheet Unable to complete.
- Choose Photos required, and whether to Produce a PDF for it; change the PDF heading / PDF message if you want different wording.
- Save the checksheet.
- Optionally add ready-made reasons under Reasons a checksheet could not be completed on this page.
- Engineers see the button at the top of that checksheet after their next sync.
Rename Yes/No buttons on a checksheet (for example to Pass/Fail)
- Open the checksheet in the Simple Builder.
- Find the Yes/No field you want to reword.
- Change its Label preset to the wording you want (Pass / Fail, OK / Not OK, etc.), or pick Custom and type your own two labels.
- Save the checksheet.
- The new labels appear immediately in the app, on the admin completion form, and on the next generated PDF. Older answers still display correctly after you rename the buttons.
Important Options
- Numbering affects the reference shown on completed PPM/Insp PDFs and related communications — align it with your compliance filing before go-live.
- Auto-pause only influences automatic generation behaviour; it is a safeguard when customer status implies work should not be raised.
- Defect tracking off removes defect UI from checksheets; defects already logged on past visits stay there, but engineers cannot mark new ones.
- Carry forward only makes sense when defect tracking is meaningful for your process.
- Defect severities are fixed to 3 levels (Critical, Advisory, Observation). You can rename them for display, but cannot add/remove levels.
- Auto-link by equipment type depends on consistent equipment types in Equipment Setup and on checksheets being tagged with those types.
- Lock Customer, Site & Equipment on PPM Jobs reduces on-site tampering with the planned customer, site and asset list; unlocking trades control for flexibility when sites are messy.
- Force Complete is per checksheet (in the builder), not on this list page — the job cannot be completed until that checksheet is completed. It does not force every question: in the engineer app and the admin app, blank required questions give a warning and can be completed anyway (the certificate then reads INCOMPLETE); the office completion form still needs them answered.
- Carry Forward Defects makes engineers answer every open defect from earlier visits (Still Open, Resolved or Couldn't check) before a checksheet can be completed. Couldn't check keeps the defect open for the next visit.
- Delete is refused with an error if active PPM schedules still use the checksheet; the message may list customers or contracts to fix first.
- Yes/No label presets in the Simple Builder affect display only — renaming buttons to Pass / Fail (or any other preset) does not break historic reports, defect tracking, or branching.
- Follow-up questions (branching) and per-answer defect rules are available only on Yes/No, Dropdown, and Radio fields — those are the only field types with a fixed answer set for the rule to follow.
- Per-answer defect rules depend on Enable Defect Tracking being on; the per-answer dropdowns still show in the builder when defects are off, but no defect UI will appear in the engineer app.
- Required defect mode will block submission if the engineer picks that answer and skips the defect entry — use it sparingly for genuinely non-negotiable failures, not routine observations.
- Last check dates — a checksheet can show when the equipment was last checked: tick Last PPM check or Last <checksheet name> under Equipment Details → Automatic — from your PPM checks in the Simple Builder (or drag the automatic tools in the advanced designer). The date is the last check before this visit, it prints on the PDF and shows locked while the check is being filled in (office, engineers website, both apps) — only on sheets that have it. Never add a question for it; nobody can type it.
Common Mistakes
- Designing a beautiful PPM checksheet but emailing only the Job PDF that never includes PPM merge content — the checksheet certificate and the Job PDF are two different outputs (see the How it works panel on PPM/Insp), so check which one your emails attach in Email Setup.
- Expecting Job PDF Template blocks to populate per-equipment PPM tables without configuring the template — the Job PDF Template is a different document path from the checksheet certificate.
- Leaving equipment types empty on checksheets then wondering why auto-link never suggests the right form.
- Deleting a checksheet that is still on live schedules — remove or swap it on each contract first.
- Changing start number without understanding the next counter — coordinate with the office so certificate numbers stay legally or contractually continuous.
- Leaving {ppm_number} out of the PPM PDF Filename pattern and wondering why the PPM number still appears at the end of the file name — it is always added so every file name stays unique.
- Expecting a new file name pattern to rename PDFs that already exist — only PPMs completed or regenerated afterwards get the new name.
- Switching off Lock Customer, Site & Equipment on PPM Jobs and then being surprised when engineers change the site or attach extra assets on PPM jobs.
- Duplicating many copies with small edits and ending up with a long list of similar titles — use clear naming (site, standard, year) so schedulers pick the right one.
- Creating a separate checksheet just to get Pass / Fail wording when a simple Yes/No label preset on the existing field would do the same job and keep history aligned.
- Duplicating a whole field just to capture a conditional reason ("Damaged? Yes / No" + "If yes, describe…") — use a follow-up under the Yes branch instead so the reason field only shows when it's relevant.
- Turning Required defect mode on for every failing answer and surprising engineers with hard-stop prompts — start with Optional for most, reserve Required for genuine compliance-critical failures.
- Marking questions Required that only apply some of the time (readings for one operating mode, an F-Gas question on equipment without refrigerant) — every visit where they do not apply prints INCOMPLETE. Untick Required or use Show only if....
- Using Unable to complete for a sheet that was only partly done — it means the work could not be carried out at all, the answers are not filled in and the unit stays due. A partly-done sheet is completed with its blanks (it prints INCOMPLETE if required questions were left).
- Expecting an Unable to complete sheet to move the unit's next PPM date on — it does not; book the revisit (a Create revisit quote is on the job's PPM row).
- Typing empty strings into Custom yes/no labels — the field needs two non-empty labels or the preset falls back to Yes / No.
Related Areas
- Equipment Setup — equipment types used for dropdowns and for auto-link suggestions on schedules.
- PPM Contracts — where checksheets are attached to contracts and visit patterns; where schedules are paused manually.
- Defect Severities — labels for defect seriousness when tracking is enabled.
- Job PDF Template editor — for the whole-job cover sheet, which can include multi-equipment tables for one combined PDF per job.
- Email Setup — job completion auto-send by category and PDF attachment choices for customer emails.
- Jobs and the engineer app — where checksheets are completed, defects recorded, and completion rules enforced.