Field Ascend Help Centre

PPM / Inspection contracts

Admin PortalMenu: PPM/InspUpdated 2026-11-22Markdown (.md)

What This Area Is For

PPM/Insp opens PPM/Inspection Contracts — the hub for planned preventive maintenance and inspection agreements. A contract belongs to one customer and groups everything you need to run recurring visits: who is visited, which assets are checked, how often, optional billing, and links through to the jobs the system creates from those plans.

Think of the hierarchy the product uses:

  • Customer — who the agreement is with
  • Contract — the umbrella (reference, dates, pause, optional contract billing)
  • Schedules — one row per “visit pattern”: site, equipment, checksheet, frequency, engineer, pricing where relevant
  • Jobs — individual visits generated from schedules (engineers work these like normal jobs)

This list page is for finding contracts, seeing health at a glance, and jumping into a contract or supporting tools. Open (or clicking the row) shows the contract page. People who can edit PPM schedules get two tabs: Schedule Builder (every schedule row, with the visits it makes drawn under it — book, skip or create one visit there) and Details & billing (contract details, billing, renewal, due-action defaults). Everyone else gets a read-only Schedules view with a plain-English summary and the year of visits, and a billing summary. See the PPM contract page doc.

What You'll See On This Page

Hub tabs

A sticky tab bar under the site header switches between the PPM hub pages: Contracts (this page), Visits (PPM visits that have reached the booking stage, with their booking status — see below), Quotes (PPM quote-first channel), Invoices (contract billing), Results (every completed checksheet, account-wide — see PPM Results tab below), Compliance, and Setup (the company-wide When a visit comes due settings — booking and appointment reminders, visit-quote grouping, the planner's PPM due strip — the Contract services card (see Contract services below), then one card per PPM settings page: checksheets and PPM settings, result labels and colours, compliance types, PPM quote templates, the invoicing queue, rebuilding PDFs, schedule health, the PPM recycle bin). Tabs only appear when you have the matching view permission.

Visits tab

Visits is the booking list for planned maintenance: one row per visit, as a list. A visit appears here once its schedule reaches a booking-reminder lead day (when Remind the office to book visits is on under PPM/Insp → Setup) or its job is created, so a visit further ahead than that is not listed yet — every visit still to come is under its schedule on the contract page and on the planner. (There is no longer a month calendar here: Open the planner, top right, shows booked visits.) Each visit carries a booking status: Needs booking (no planner date yet — amber), Contacted, Planned (a job exists on the planner), Confirmed (the customer has agreed the date — set by hand, or automatically when a customer completes a pre-visit form set to confirm the visit), Done, or Skipped. Search, and filter by status, customer, contract, PPM type or engineer; a range menu chooses how far to look (the next 30 or 90 days — 90 is the default —, 6 or 12 months, overdue only, or everything including done); Columns and CSV sit at the right of the toolbar. Done and skipped visits are left out unless you pick that status or Everything (incl. done).

Above the list, a line reads for example Showing 13 of 13 visits · 40 more due after 25/01/2027 — choose a longer period in the box above to see them: the range box decides how far ahead the list looks, and this says how many visits lie beyond it. Pick Overdue + next 12 months to see a whole year of a weekly contract. The page opens on 90 days each time.

Open a visit for the drawer: Mark contacted, Book (it reads Re-plan once the visit has a date — pick the day, time and engineer; this creates the job if it does not exist yet and puts it on the planner), Confirm with customer, Skip (only for a visit that has no job yet: it is recorded as skipped by the office and no job is made for it; a visit that already has a job cannot be skipped, and the bulk Skip… leaves those visits alone), Reopen. A visit whose job was deleted (to the recycle bin, or permanently) shows the job number with "deleted" in the Job column and is never made again by itself: when the schedule has already moved on to its next date it counts as Skipped and leaves the list; when the schedule is still waiting on it (a schedule counted from the last completion) it stays Needs booking — Book makes a new job for it, Skip moves the schedule on. Restoring the job from the jobs recycle bin brings the visit back as it was; the job number in the drawer opens the job. Each button only shows where it applies. Tick several rows (or the box at the top of the list for every row shown) for Mark contacted, Book selected… and Skip… in bulk. Viewing needs PPM access; the actions need the schedule-editing permission.

Book selected… books many visits at once. Its first line says how the ticked visits are spread (for example "Due on 53 different dates, 04/11/2026 → 03/11/2027"). Then three choices:

  • Day — Each visit on its own due date (moved to the schedule's Planned Day when it has one — the default when the visits fall on different dates), or All on one date.
  • Engineer — The schedule's engineer, or This engineer.
  • Time — The schedule's time slot (shown in brackets, from the row's Starts … lasts … in the Schedule Builder), or your own From – to.

Visits that already have a job are moved onto the new slot (nothing is created twice); the others get their job now. To spread a whole year of weekly jobs that were created earlier: choose Overdue + next 12 months, tick the box at the top of the list, Book selected…, keep Each visit on its own due date, choose the time (for example From – to 09:00 to 10:00) and press Apply. If a visit cannot be booked (for example its schedule has no engineer), it is listed by its due date under the button with the reason.

Reminders to book a visit (so many days before it is due), the chase when nobody has been contacted, and who gets the to-do are set for every contract on PPM/Insp → Setup → When a visit comes due — see the Regular visits doc. The PPM due button on the planner shows the unbooked visits as a strip; clicking one opens its contract with that schedule in view, ready to book. In the planner's day view, visits a schedule will book by itself (its Add to planner tick on, an engineer named, job not created yet) show as a dashed Upcoming block in that engineer's row.

Page title and top actions

The heading is PPM/Inspection Contracts, with a How it works button beside it. On the right you will see:

  • Calendar — a month calendar of PPM jobs and the visits still to come across every contract (see PPM Calendar below)
  • Export — download the current contract list as CSV with a column picker (respects active search and filters)
  • More — a menu with Bulk import contracts (people who can edit PPM schedules; see Bulk import contracts below), Contract templates (design PDFs used for contract documents), PPM checks setup (checksheets, equipment-type links, company-wide PPM options and pause policies), Schedule health (operational dashboard: overdue schedules, PDF queue, skipped visits, KPIs) and Recycle bin (deleted contracts and their schedules can be reviewed or restored from there, depending on your process)
  • New Contract — pick a customer, then Regular visits plan (a simple sheet for visits that repeat — cleaning, site checks; see the Regular visits doc) or Full contract (equipment, checksheets, rotations — opens the Schedule Builder)

PPM Calendar — the Calendar button (or Visit calendar in a row's ⋯ menu, for one contract) opens a month calendar of the PPM jobs and the visits still to come. Counts across the top give overdue, due this month, due next month, completed this month, active schedules and the completion rate; colours mark complete, overdue, due today, future job and planned visit; click a day to see its items (a job number opens the job); the Year breakdown tab shows a card per month with its PPM jobs, how many are done and pending, and the percentage complete — click one to jump to that month.

Bulk import contracts — in the More menu for people who can edit PPM schedules. Download the Excel template (columns Contract Number, Contract Name, Customer Name, Start Date, End Date, Notes; the number and end date are optional), fill in one row per contract, upload it (.xlsx, .xls or .csv), check the preview of which customer each row matched, then press Create N contracts (paused). Imported contracts are created paused — review them and un-pause when you are ready.

Summary tiles

A strip of tiles across the top summarises:

  • Contracts — how many contracts there are
  • Active — not paused (by hand or by a customer-status policy), not past end date
  • Paused — paused by hand or by a customer-status policy
  • Expired — past contract end date
  • With overdue visits — running contracts with at least one visit past its date
  • Annual value — the contracts' annual values added up (in your account currency)

The first four tiles are links: click one to filter the list.

A second, smaller strip under it shows:

  • Customers on contract — customers with at least one contract whose term has not ended
  • one figure per service when your company uses contract services (for example PPM · 42 contracts · £18,400.00), with a line under it such as Bureau only · 9 customers — customers whose only running contracts are that service; a No service figure counts contracts not given one yet. Click a service to filter the list to it
  • Renewals due in 30 / 90 / 180 days — running contracts ending in that window that nobody has marked renewed or not renewing (still to deal with, or renewal quoted). Pick 30, 90 or 180 (90 is the default; the page remembers your choice in this browser); click the number to list those contracts
  • Sales pipeline — the value of open sales leads, shown to people who can see Sales when there is any; click it to open Sales

“How PPM Contracts Work” guide

A collapsible panel (the How it works button beside the heading; it opens by itself while you have no contracts yet) explains the customer → contract → schedules → jobs flow, prerequisites (sites, equipment, checksheets, job PDF template), and the difference between PPM checksheet PDFs (per equipment) and the job PDF (whole-job report). It can stay open or closed; the page remembers your preference in the browser.

Search and filters

A search box matches contract number, contract name, customer name, or the name or address of a site on one of the contract's schedules.

The Dates button next to it opens two ranges. Start date between filters contracts by contract start date (from / to). End date between filters contracts by contract end date (from / to). Open-ended contracts (no end date) are excluded when either end-date bound is set. Clear dates empties the boxes and Apply uses them.

Filters are chip groups you can stack. Each chip is a toggle — click to add it, click again to remove it. Within Service, Status, Renewal or Signature, several chips together mean "any of these"; the groups combine with each other.

Service (only when your company uses contract services; All clears it) — one chip per service, plus No service for contracts not given one.

Status (All clears it):

  • Active
  • Paused
  • Expired
  • Billing due — a contract invoice is due but not created

Renewal (Any clears it):

  • Not renewed — no renewal quote on the go and no renewal status set: still to deal with
  • Renewal quoted — the contract's own renewal quote is drafted, sent or accepted but not yet applied, or the contract was marked Renewal quoted by hand because its renewal was quoted on another quote (for example one quote covering several contracts)
  • Renewed — the next term exists, or the contract was marked renewed by hand
  • Not renewing — marked as not renewing

Signature (Any clears it) — where the contract document stands with online signing:

  • Awaiting signature — sent for signature and not signed yet (including links that have expired)
  • Signed — signed by the customer online
  • Declined — the customer declined it online
  • Not sent — never sent for signature, or the request was cancelled

Visits (pick one, click again to clear):

  • Fully serviced — every generated visit job is completed and no schedule still has a visit due within the contract term (open-ended contracts only qualify when nothing further is scheduled)
  • Outstanding — contracts with incomplete visit jobs or visits still due within the term

Example: Active + Expired + Paused with Not renewed and Fully serviced lists contracts whose visits are done and whose renewal nobody has dealt with yet — a "still to quote" list. Marking a contract Renewal quoted (or renewed, or not renewing) takes it off that list.

Press Search to apply the text and date filters; Clear filters resets everything and shows while any filter is on.

Contract table

Each row shows:

  • Contract — the contract number (a link) and its name (Unnamed contract when it has none), with small tags under them: From quote … when it was created from a PPM quote, Renewed from … on the next term of a renewed contract, Renewal quoted when it was marked renewal quoted by hand (hover for the date), and renewal-quote chips when renewal quoting is set on the contract: Renewal drafted — send, Renewal sent — awaiting, Renewal accepted — apply, Renewal declined, Renewal rejected or Renewal expired, or Renewal quote due in remind-only mode
  • Service — only when your company uses contract services: the contract's service, or —
  • Customer — with the customer's main contact under the name: name, phone (click to call) and email (click to write). The contact shown is the customer's first contact ticked as a Service contact, else their first contact; a missing phone or email falls back to the customer's own
  • Site — the first site on the contract's schedules, with +N more sites when there are several (hover to list them)
  • Visits — X/Y done with a progress bar (completed visit jobs vs visit jobs created), then the number of schedules (each schedule has its own frequency — open the contract to see them). It turns green with “fully serviced” when all visits are complete and nothing further is due in the contract term; more due shows while future visits remain. A contract with no visit jobs yet says No visits yet
  • Next visit — the earliest of the next open visit job and the schedules' next visit dates (red when overdue), with N days overdue, Today, Tomorrow or In N days under it and job created when that visit's job already exists; None scheduled when there is nothing
  • Last job — link to the most recent related job, if any
  • Term — the start and end dates (From …, Until … or Open-ended), with Ends in N days (or Ends today / Ends tomorrow) under it when it ends within 30 days
  • Status — Active, Paused, Expired, Renewed → (next contract) or Not renewing, with a line under it: Manual for a hand pause, or the customer status that paused it automatically (for example Ceased Trading, Cash Only — or your company's own name for that tick, set in Customer Options —, On Hold, or Credit Limit Exceeded when your account uses those automatic pause rules), or on a renewed or not-renewing contract Runs to a date, Active to a date or Term ended — and, once the contract has been sent for signature, a further line: Awaiting signature, Signing link expired, Signed (hover for who signed and when) or Declined
  • Billing — Invoice due with the amount and a Create now button (people who can edit invoices); Auto or Tracked with the frequency and timing under it (for example Monthly, in advance) and the Next invoice date; or Manual when billing is not tracked on the contract
  • Value — the contract's annual value (the same figure the Annual value tile adds up), or —
  • Actions — Open (the contract page) and a ⋯ menu: Visit calendar, Download PDF (a list of templates to pick from when you have more than one), Email contract and Send for signature (people who can edit PPM schedules — each opens the contract with its email window ready; see the PPM contract page doc), Create due invoice or Raise next invoice now (people who can edit invoices), and Delete contract (protected confirmation — type DELETE; people who can delete PPM contracts)

A count at the right of the search row says how many contracts are shown, and filtered when a filter is on.

Banners and empty states

  • After a successful delete, a green confirmation may appear (contract moved to recycle bin).
  • If nothing matches filters, you get guidance to clear filters.
  • If you have no contracts yet, the empty state says so and offers New Contract.

What You Can Do Here

  • Browse and filter contracts by lifecycle, billing pressure, visit completion (Fully serviced / Outstanding), and text search
  • Export the current view to CSV (opens in Excel) via the Export button — a column picker lets you choose which columns to include (contract number, name, service, customer, contact, contact email, contact phone, sites, number of sites, schedule count, visits completed, next visit due, last job, created, start/end dates, status, renewal, billing, annual value); the export respects the active search, date ranges and filters
  • Create a new contract for a chosen customer
  • Open a contract to change its schedules (and see the visits each one makes) on the Schedule Builder tab, and its details, billing and renewal on Details & billing
  • Download a contract PDF (⋯ menu → Download PDF)
  • Delete a contract (type DELETE to confirm); existing jobs are not deleted, but new PPM jobs stop and auto-invoicing stops for that contract — restores are via the recycle bin where available
  • Look at the month Calendar of PPM jobs and visits to come, for every contract or one
  • Bulk import contracts from a spreadsheet (they arrive paused)
  • Jump to checks setup, contract templates, schedule health, or the recycle bin from the More menu without hunting through other menus

Common Tasks

Create your first contract

For visits that simply repeat (cleaning, weekly site checks) use New Contract → Regular visits plan instead — see the Regular visits doc. For a full equipment contract:

  1. Select New Contract.
  2. Choose the customer and press Full contract — you are taken to the Schedule Builder where the new contract exists.
  3. Fill contract details (name optional, start/end dates, notes, pause if needed) and save.
  4. Add schedules (site, equipment, checksheet, frequency, engineer, dates, etc.) — use Add Row, Quick Add, 1 Row / Equip, 1 Row / Site, and Apply to All where offered to create one schedule or many schedules quickly.
  5. Confirm billing if you invoice from contracts: enable tracking, pick frequency (for example Per-Visit, Monthly, Quarterly, Annual), In Advance vs In Arrears, tax and pricing mode as shown on the form, then save the billing section.
  6. Optionally set Invoice Wording on the same Billing area (item name and/or description template). Leave blank to use the account default under Setup → Invoice Settings → PPM Invoice Wording, or the standard “PPM Contract…” text if no default is set. Use tokens such as {{equipment_list}} when the invoice should list every asset on the contract.

Contract services — tell PPM, Bureau and other kinds of contract apart

When you run more than one kind of contract (for example PPM maintenance and a Bureau monitoring service), give each contract a service:

  1. PPM/Insp → Setup → Contract services — type a name and press Add service. Rename, reorder (arrows) or Remove a service on the same card. Removing one leaves its contracts with no service. Needs access to PPM checks setup.
  2. On each contract, Details & billing → Contract details → Service — pick one (or — No service —) and save. A contract has one service; a renewal keeps it.
  3. The Contracts list then gets a Service column, a Service filter, and a total per service in the second strip.

With no services set up nothing changes on the page. When your old contracts are brought in from a spreadsheet by the assistant on Help & requests, it can give every contract in a file its service.

Open an existing contract to change schedules

From the list, choose Open on the row (or click the row). The contract page opens on its Schedule Builder tab — the main place to maintain visit patterns. Change a row and the visits under it redraw as a dashed preview until you press the row's ✓; click a visit to book, re-plan, create or skip it. Contract details, billing and renewal are on the Details & billing tab. See the PPM contract page doc. Saved rows are shown alongside new rows; rows can include multi-equipment selections, checksheet rotation, planned day rules, seasonal bands, engineer assignment, job presets, prices, notes, and planner options.

Add schedules in bulk from the workspace

The contract workspace supports several bulk schedule creation routes:

  1. Quick Add / Apply All — choose a site or all sites, create 1 Row / Equip or 1 Row / Site, then push shared values such as start date, frequency, engineer, preset, checksheet, or price down into all rows.
  2. Template — download a smart Excel workbook pre-filled with the customer's sites and equipment, plus dropdown lists for valid checksheets, frequencies, engineers, presets, sites, and planned days.
  3. Upload — upload .xlsx, .xls, or .csv, review the preview modal, resolve ambiguous site/equipment matches, untick rows to skip, then confirm import.

The spreadsheet flow can handle comma-separated multi-equipment rows and comma-separated checksheet rotations such as Full PPM, Filter Clean. After import, open the Schedule Builder matrix for advanced exceptions like skipping one asset on one visit, varying checksheets per equipment, per-visit preset overrides, seasonal bands, or planner time slots.

Export schedules to Excel

Use Export on the contract workspace to download current schedules as an Excel workbook. The export is useful for review, customer checks, and offline editing. Multi-equipment and rotating-checksheet rows are represented as comma-separated values where possible, but per-visit exceptions should still be checked under each row in the Schedule Builder.

Create upcoming jobs immediately

Saved schedule rows can create jobs before the automatic generator reaches them. Create jobs on a row lists that schedule's visits for the contract term (already created, skipped, or not yet created) — tick the ones you want and press Create Selected. Nothing is ticked for you, and the jobs are created unplanned, ready to put on the planner. Create All Jobs at the top does every saved row at once and asks how many upcoming visits to create — it offers the visits of the next 3 months. Both skip paused schedules, stop at end dates, and only create seasonal visits inside active seasonal months. Every schedule also creates each job by itself, its days ahead before the visit, so you rarely need these. To book a visit with an engineer and a time instead, click the visit under its schedule row and press Book, or tick visits on the Visits page and use Book selected….

When “Next visit” looks wrong

Next visit is the earliest of the next open visit job and the next visit date across active schedules. If it says None scheduled, schedules may be missing, paused, or dates not set. Open the contract — the sentence under each schedule says when its visits are and why, and a red The next visit is not until … line (with Carry on from today) marks a schedule whose next visit was left too far away.

Handle a contract that shows Paused with a reason such as Ceased Trading

That is usually policy pause: the customer record flags a status your organisation chose to treat as “do not generate PPM work.” Clear the customer status or adjust the pause policy options inside PPM/Insp Checks Setup (same ideas as on-screen links: customer edit vs setup page).

Contract renewal

On the contract's Details & billing tab, Renew Contract (with confirmation) either creates a new contract for the next term or extends this one, depending on PPM/Insp Checks Setup → Renewals (the dialog lets you choose for that one renewal). A new contract gets every schedule copied with its dates moved on; the old contract is marked Renewed and finishes its own term — it is not paused. If a copied schedule's first visit date has already passed (a renewal done after the old contract ended), that schedule is left paused, and a Renewal notes banner says so: check its dates and change the start date if the visits have moved. No job is created for it until it is resumed. Jobs for the new term are then created as usual — automatically when due, or now with Create jobs on the row.

When a renewal is handled another way, set it by hand from Renewal status in the contract header: Mark as renewal quoted, Mark as renewed (optionally linking the next contract), Mark as not renewing, or Clear renewal status. Use Renewal quoted when you quote several contracts' renewals on one quote — for example one new contract for all of a customer's sites. Each contract you mark leaves the Not renewed filter, shows under Renewal quoted, and gets no renewal quote of its own until you clear the status. Once the customer accepts and the new contract exists, mark each old contract renewed and pick the new contract.

When billing shows Invoice due

Use Create now (or ⋯ → Create due invoice) after confirming the prompt — the system generates the invoice using the contract’s billing configuration (including any Invoice Wording override, or the account PPM wording default). The invoice carries the contract’s Customer Ref / PO number; if the contract has PO mandatory for this contract ticked and no Customer Ref / PO is set, the invoice cannot be emailed until one is entered.

Customise PPM invoice item name or description for one contract

  1. Open the contract and go to its Details & billing tab (Auto-Invoicing Settings).
  2. Under Invoice Wording, set an Item Name and/or Description Template, or leave blank to inherit Setup → Invoice Settings → PPM Invoice Wording.
  3. Save. New invoices from this contract (auto or Create Invoice) use that wording; existing invoices are unchanged.

Export or bulk-edit schedules via spreadsheet

On the contract workspace, use Export, Template, and Upload in the schedule toolbar. The files are Excel-compatible workbooks, and uploads accept .xlsx, .xls, and .csv. The import has a preview-and-confirm step before schedules are created.

Delete vs pause

  • Pause (checkbox on contract details) stops new job generation but keeps the structure.
  • Delete removes the contract (and its schedules) from active use; existing jobs remain; billing generation stops. Prefer pause if you might resume. Deleting a contract that was the next term of a renewal puts the contract it renewed back to not renewed.

PPM Results tab

The Results tab is an account-wide list of every PPM checksheet result — the same records you see one asset at a time in the equipment page's PPM Check History panel, or one job at a time in the job's PPM panel. Use it for questions like "every checksheet completed last month", "every fail this quarter", "every test for one customer this year" or "which certificates have no PDF yet".

It behaves exactly like the Jobs, Equipment and Quotes lists:

  • Search matches PPM number, external reference, checksheet title, equipment description / ref / serial, site, customer and job number.
  • Date range with Show All, previous / next month arrows and presets (today, this week, this month, quarters, financial year — using your account's week start and financial-year settings). The date is the completion date (creation date for pending rows).
  • Toolbar filters (multi-select, with in-menu search for Customer and Site): Checksheet, Customer, Site, Completed by (engineers, plus Office for results recorded by an admin user and None recorded for imported history), Result (Pass / Fail / Advisory / Unscored / Not scored), Source (Job / Imported / Manual) and Status (Complete / Pending / Unable to complete — a checksheet an engineer marked as not doable, shown as a red badge).
  • Hide archived (on by default) and No PDF yet tick boxes.
  • Columns chooser with drag-to-reorder, resize, Auto-Fit and Reset to default; funnel filters on the column headers; the layout and toolbar filters are remembered per user.
  • Download CSV exports the visible columns in the current order with the current filters.
  • Up to 2,500 matching results always show together on one page whatever the row limit says; when more match, a blue note above the table says so.

Columns include Completed, Status, Result, Checksheet, PPM #, Equipment, Ref, Serial No, Type, Site, Postcode, Customer, Job, Completed by, Source, Open defects, PDF, Created and Unable to complete — reason (the reason an engineer gave when a checksheet could not be done).

  • Result is rolled up from the scored answers: Fail if anything failed, else Advisory, else Pass; Unscored when answers exist but nothing was scored, and — for older checksheet templates that do not score.
  • Job links to the job the checksheet was completed on. Results with no job (history imported from a previous system, or a test recorded straight against the asset) show an Imported / No job badge with the external reference underneath.
  • Open defects is the number of currently open defects on that asset for that checksheet — defects belong to the asset, not to one individual test.
  • PDF opens the certificate; a dashed Generate button appears for completed results that have no PDF yet (imported history renders on first request).

Row actions: click a row to open its job in a popup (or its PDF when there is no job); right-click for Open in popup, Open in new tab and Copy link.

Bulk actions on ticked rows: Download PDFs (zip) (up to 200 at a time), Generate missing PDFs (runs one at a time with a progress counter), Archive and Unarchive (archiving needs the Edit PPM Schedules permission and only applies to completed results; archived results are hidden from the job, the equipment history and this list until you untick Hide archived). Nothing on this page deletes a result.

From an equipment page, the PPM Check History panel has an All results → link that opens this list already filtered to that asset.

If you want Results one click from anywhere, Profile menu → Header Options (for master users) has a PPM Results button toggle (off by default) that adds it to the top navigation; it needs the same View PPM permission as the PPM/Insp button.

Important Options

  • Open-ended contracts leave end date blank until you set one.
  • End date drives Expired status on the list.
  • Billing can be off (Manual), tracked without auto-send (Tracked), or fully Auto depending on what you configured on the contract.
  • Invoice Wording on the Details & billing tab is optional. Blank inherits the account default (or standard wording). Account defaults live under Invoice Settings → PPM Invoice Wording. This is separate from Recurring Invoices.
  • Per-visit vs periodic billing changes how “next invoice” and amounts behave — read the on-page steps when enabling billing.
  • Schedule Builder spreadsheet tools are for bulk schedule setup, not for every advanced exception. Use the in-page matrix for per-equipment per-visit checksheets, skipped visits, seasonal bands, per-visit preset overrides, and planner time slots.
  • Create All Jobs creates jobs from saved schedule rows; it is separate from importing schedules and separate from contract renewal.
  • Schedule Health is the best place to investigate overdue rows, PDF queue issues, and skipped visits across your whole account, not just one contract.

Common Mistakes

  • Expecting PPM/Insp to edit checksheet questions — that is PPM/Insp Checks Setup; this page is contracts and schedules.
  • Hunting through jobs one at a time for completed checksheets — use the Results tab, which lists every result across the account with date, customer, checksheet and pass/fail filters.
  • Adding schedules before sites and equipment exist — the guide calls this out; fix master data first.
  • Uploading a spreadsheet and assuming every row imported cleanly — review the preview modal, resolve ambiguous matches, and untick rows you do not want.
  • Expecting the spreadsheet to cover per-equipment per-visit exceptions — import the main pattern, then use the Schedule Builder matrix.
  • Treating Create All Jobs as a schedule import tool — it creates upcoming jobs from already saved schedules.
  • Confusing contract PDF (agreement document) with job PDF (field job pack) or checksheet certificate PDF — three different outputs.
  • Deleting a contract thinking it removes historical jobs — it does not; it stops future automation.
  • Ignoring policy pause and repeatedly toggling manual pause — fix the underlying customer status or policy.
  • Assuming Invoice due will invoice without someone actioning it when you are not using full auto — use Create now when offered.
  • Looking under Recurring Invoices to change PPM line item names or equipment lists — use Invoice Settings → PPM Invoice Wording or the contract Billing → Invoice Wording override instead.
  • Customers (customer status, sites)
  • Sites and Equipment
  • Jobs (work generated from schedules)
  • Invoices (when contract billing is enabled)
  • Invoice Settings (account-wide PPM Invoice Wording defaults)
  • PPM/Insp Checks Setup (checksheets, pause policies, defects, numbering)
  • Contract Templates (contract PDF layout)
  • Schedule Health (cross-contract operational view)
  • Recycle Bin for deleted contracts
  • Equipment setup (equipment types for matching checksheets)
  • Job PDF template builder (optional cover / combined job report)