What this area is for
The full-screen PPM view is where you complete a planned maintenance checksheet for a piece of equipment on a job. You reach it from a job's PPM section (or the PPM step of the completion wizard) by tapping a checksheet. Checksheets are matched to equipment by equipment type — the office builds the question sets and links them to types in the admin portal.
PPM works offline: answers save to the device as you go and sync later. A checksheet already completed on the server opens read-only.
What you will see
- Header with the checksheet name and the equipment it applies to. The equipment block can show Docs / Images (compact) — Camera / Gallery / Docs, offline queue, same Can view site documents permission as the job card — for manuals on site during a PPM. A unit with a map location also shows Find asset: a map with your position, the distance and an arrow that turns as you turn, which keeps working with no signal. Near the unit it says You're here with Open check.
- The question list, grouped by any sections the office defined. Question types include Yes/No/N-A buttons, pass/fail, text, numbers, selects, and date fields; some questions require a photo or allow one to be attached.
- A locked Last <checksheet name> (or Last PPM check) line with a padlock, only on sheets whose design prints one: the date this check was last completed on the unit before this visit. Nothing to answer — it fills itself in. It reads Not done before when the unit has never had that check, and — when the phone does not have the date yet (for example a sheet added to the job with no signal). A sheet can also print a locked Next <checksheet name> due (or Next PPM due) line the same way: the date the check is next due on the unit, or No date yet when there is none.
- A comments area for overall notes.
- Complete / save controls at the bottom; a completed sheet shows its answers and completion details read-only.
- When you tap Complete with required questions still blank, the app lists them under Required questions not answered. Tap Cancel to go back and answer them, or Complete anyway. Completing with required questions blank is allowed, but the certificate's result then reads INCOMPLETE instead of PASS, with a line saying how many required questions were not answered.
- On a job with several pieces of equipment, moving to the next one when a sheet is fully answered asks Complete This Equipment?. That shortcut follows the same rules as Complete: if a defect still has to be logged, a previous defect still needs an answer, or a required question is blank, it tells you what and leaves you on that equipment. For blank required questions it says "Answer them first, or tap Complete at the bottom of the sheet to finish anyway."
Unable to complete
When the office allows it on a checksheet, an Unable to complete button sits at the top of the sheet. Use it when the work on that unit cannot be carried out at all — no access, no traffic management, unsafe, equipment removed.
- Tap Unable to complete, tap a ready-made reason if your company has a list (or skip that), type why, add photos (Camera or Library — the office may require a number of them), then Mark unable to complete.
- The sheet turns red with your reason, and the unit's dot in the equipment strip shows a red ⊘. You do not fill in the questions.
- The job can still be completed — the sheet counts as dealt with even when PPM completion is forced. The unit stays due for its PPM, and the office is told so it can arrange a revisit.
- Add photos on the red banner adds more later. Undo (only when the office allows the button) puts the sheet back to not started. Completing the sheet later replaces the mark.
- It works offline: the reason is saved on the phone straight away and the photos upload when you have signal.
Previous defects
Open defects found on this equipment on earlier visits are listed in the Previous Defects card near the top of the sheet. Each one has three buttons:
- Still Open — it is still there. The defect is carried onto this visit (under its question, when the sheet has it) and the certificate lists it as still present, with when it was first reported.
- Resolved — it has been fixed. The defect is closed and the certificate lists it as fixed on this visit.
- Couldn't check — you could not get to it this time (no access, needs a lift or a MEWP, the area was closed…). Add a short reason if you can. The defect stays open and the certificate lists it as not checked on this visit, with your reason.
When your company carries defects forward, every previous defect needs one of these answers before Complete works — the app opens the card and lists what is left. An answered defect drops off the card.
What the certificate shows
- The result is FAIL if any check failed; otherwise INCOMPLETE if required questions were left blank; otherwise PASS.
- Defects are grouped by what happened on this visit: found on this visit, still present, fixed on this visit, and not checked on this visit.
- Photos are the ones taken on this visit. A photo from an earlier visit only appears beside a defect you confirmed as still present, marked as from that earlier visit.
Readings, data tables and pass bands
Some questions are number readings, and some are a data table — a grid you fill in row by row (for example a water meter test with a Reference meter column, a Meter under test column, and a calculated % Difference column that works itself out as you type). Above a table you may see one or more constants (such as a tolerance percentage) that the office lets you adjust on the day; calculated columns update instantly.
If the office set a pass band on a reading or a table column, the value colours itself as you type: green in range, amber for an advisory, red for a fail. A PASS / ADVISORY / FAIL pill above a table shows the worst cell. Empty cells are not scored.
- Last: … ghost text in an empty reading or cell is the value recorded on the previous visit to this piece of equipment (number fields also show the date underneath). It is only a hint — type the reading you actually took.
- Readings history and PPM check history cards sit directly above the questions when your office has switched on Equipment History (App Settings › Job Screen Layout) and your account has Can view equipment history. Readings history shows each reading line of this checksheet: the latest value with PASS / ADVISORY / FAIL, the change since the last visit, and — on the first three lines, or when you tap a line — a small chart with the pass band shaded, the lowest and highest, and the date (with the job number when the reading came from a job; readings brought over from an old system show the date only). PPM check history lists the last checks of this checksheet on this unit: completed or skipped, the PPM number, the job, the date and who did it, and a PDF button that opens the certificate (the PDF needs signal). Both cards come with the normal sync, so they work with no signal; a check you finish appears in them after the next sync. Tap a card's title to fold it away.
- A Previous Defects count uses the office’s name for the critical severity (it may still read like “critical” if they never renamed it).
- An out-of-range value may show a Report defect prompt on that cell. If the office made it required, you cannot complete the sheet until that defect is logged.
- Some bands raise the defect for you: it appears the moment the reading is out of range, tagged AUTO with the row it came from, and disappears again if you correct the reading back into range. You cannot rewrite or delete an auto defect, but you can add photos and pick an Action where the office allows it. Defects you log yourself are never touched.
How it fits the job flow
- The job's PPM section shows each applicable checksheet with a status (not started / in progress / complete).
- If your company forces PPM completion, the job cannot be marked complete until every applicable checksheet is complete — the wizard's PPM step will hold you there.
- Completed checksheets feed the office's PPM records and any certificates the office generates from them.
Common tasks
| Goal | What to do |
|---|---|
| Fill in a checksheet | Job → PPM → tap the sheet → answer each question → Complete. |
| Attach a photo to an answer | Use the camera/photo control on the question that offers it. |
| Describe a photo / tag it Before or After | Long-press the photo → Photo details → type a Description / caption and/or pick Before / After (None takes the tag off) → Save. Only on photo questions where the office switched photo notes or tags on in the checksheet. The tag and caption then show under the photo's thumbnail; deleting the photo deletes its note. Works offline — the note goes up with the photo. Whether the caption and tag print on the certificate is decided by the checksheet's design. |
| Finish a partly-done sheet | Reopen it from the job's PPM section — your saved answers are still there. |
| Review a finished sheet | Tap it — it opens read-only with the recorded answers. |
| Fill in a data table | Enter each row's readings — calculated columns fill themselves; adjust any constant the office exposed if the day's tolerance differs. |
| Clear an auto defect | Correct the reading back into range — the AUTO defect withdraws itself. |
| Open a manual while on the PPM | Use Docs / Images on the equipment block. |
| Answer the defects from earlier visits | In Previous Defects, tap Still Open, Resolved or Couldn't check on each one. |
| Record that a unit could not be done at all | Tap Unable to complete at the top of the sheet → reason (+ photos) → Mark unable to complete. Only on checksheets where the office switched it on. |
| Finish with a required question you cannot answer | Tap Complete → Complete anyway. The certificate will say INCOMPLETE — tell the office if the question does not apply to this kind of visit. |
Common mistakes
- Expecting a checksheet on equipment of the wrong type — sheets only appear for equipment types the office linked to them.
- Trying to complete the job with sheets outstanding while PPM completion is forced — finish the sheets first.
- Assuming answers were lost after going offline — they are saved locally and sync when you're back online.
- Editing a completed sheet — completed checksheets are read-only in the app; ask the office if a correction is needed.
- Copying the Last: … ghost value as if it were today's reading — it is last visit's figure, shown so you can spot drift.
- Trying to delete an AUTO defect — it is owned by the office's range rule; only a corrected reading removes it.
- Using Unable to complete for a sheet you did most of — it means nothing could be done on that unit; finish a partly-done sheet with Complete instead.
- Tapping Complete anyway and expecting a PASS — a sheet completed with required questions blank prints INCOMPLETE.
- Leaving a previous defect without an answer — Complete waits until each one has Still Open, Resolved or Couldn't check. Use Couldn't check rather than Resolved when you simply could not get to it — Resolved closes the defect.
Related areas
- Jobs — PPM is a section on the job and a step in the completion wizard.
- The office builds checksheets, links equipment types, and generates certificates from the admin portal.