Field Ascend Help Centre

PPM contract page

Admin PortalMenu: PPM/Insp > open a contractUpdated 2026-11-24Markdown (.md)

What This Area Is For

Opening a contract — Open on the PPM/Insp list, or a link from a PPM invoice, a PPM quote, a project, the CRM, or a visit in the planner's PPM due strip — shows one contract on one page. Its header says who it is for and whether it is running; the tabs underneath hold everything about it.

What you see depends on whether you can edit PPM schedules:

  • You can edit PPM schedules — two tabs: Schedule Builder (it opens here) and Details & billing. Everything is changed here.
  • You cannot — two read-only tabs: Schedules (each schedule and the visits it makes this year) and Details & billing (a short summary of how the contract is billed).

What You'll See On This Page

The header (everyone)

  • A Contracts › customer link back to the contracts list.
  • The contract number, the customer and the contract's name.
  • A status pill: Active, Paused, Ended (past its end date), or Paused — customer … when a customer status pauses it (for example on hold, cash only — or your company's own name for that tick, set in Customer Options —, ceased trading, or over their credit limit) — with Open the customer beside it so you can clear the status there.
  • The contract's dates (or open-ended) and, when it is billed through the contract, how often (for example Billed monthly).
  • Buttons for the contract document: PDF (pick a template when you have more than one), Email, Send for signature and Comms (the emails sent about this contract) — see Email a contract and Send a contract for signature below.
  • Chips that say where the contract document stands: Emailed / Email failed, Awaiting signature, Signed by … on …, Declined, and Changed since signed.

Schedule Builder tab (people who can edit PPM schedules)

This is the full Schedule Builder — the table of schedule rows (site, equipment, checksheet, certificates, start date, frequency, planned day and time, engineer, job preset, notes, jobs) with Add Row, Create All Jobs, Export / Template / Upload and Quick Add / Apply All. The columns and buttons are explained in the PPM Contract Schedule Builder doc.

Each schedule is drawn as a card:

  • The band on top — the schedule's number (#1, #2…), its name (site and equipment), how often it repeats and when it starts, and a chip: Up to date, N overdue, Paused or Not saved.
  • The row itself — the schedule's settings, edited in place. Press the row's ✓ to save a change.
  • The visits under it — what the schedule really makes:
  • A sentence saying what it does (how often, on which day, who, where the jobs go and how far ahead they are created), and the next visits.
  • Visits with ‹ › arrows to move the window (and back to now). Weekly to 4-weekly schedules are drawn in weeks, monthly to 6-monthly in months, yearly and longer in years. Each window starts from that schedule's own start.
  • One line per piece of equipment (or one line for a general visit). A cell shows the visit's day (or month, for yearly) and the checksheet's letter — the key is on the bar; – means a general visit. Colours: green done, blue booked (on the planner), dashed upcoming, red overdue, struck-through skipped. A small bar under a cell shows part progress (some of the checksheets done).
  • Pattern repeats every N visits — how long the checksheet rotation is (1–120), with its length in words beside it (for example = 1 year).
  • Quick fill checksheet — pick a checksheet to use it on every visit of every piece of equipment on the schedule (you are asked to confirm), or no checksheet (general visit).

Editing a row previews it. Change the frequency, dates, planned day, engineer, times, Add to planner, the days before due or the cadence on a saved row and the visits under it redraw straight away as dashed visits, with Not saved — the dashed visits are a preview. Press ✓ on the row to save. Nothing changes until you press ✓. A new row that is not saved yet says Press ✓ on this row to save it — its visits then show here.

"The next visit is not until …" — a red line under a schedule whose stored next visit is further away than its frequency allows (for example a yearly schedule changed to monthly just after a visit, before the next visit was brought forward). Carry on from today plans it from today on the new pattern.

One visit

Click a visit's cell (or Tab to it and press Enter). Under the strip it lists that visit: its date, the checksheet, whether it is done, booked (with the planner date and time), has a job not yet planned in, or is not created yet — and a link to the job, which opens in a pop-up window. A skipped visit says why (for example skipped by the office, or the contract or customer was paused). Each visit shows only the buttons that apply:

  • Book (it reads Re-plan once there is a job) — pick the Date, From, To and Engineer (it starts on the visit's own date, the schedule's time and engineer) and press Book it. This puts the visit on the planner, creating its job first if it does not exist yet. Moving a visit to another day is the same thing: book it on that day.
  • Create the job now — after a confirmation, creates that visit's job straight away.
  • Skip this visit — asks for a reason (for your records; the customer is not told). A skipped visit is never created.
  • Put it back — undoes a skip made by the office.

These change that one visit only; the schedule's pattern stays on its row. While a row has unsaved changes the visit buttons are hidden — save the row first.

Under the buttons, This visit uses shows what that position in the pattern uses (pattern position 2 of 4 — every visit in that position follows it): the Job preset (or the schedule's own), and for each piece of equipment its checksheet, — no checksheet — or Not on this visit. Change them and press Save what this visit uses, or use on every visit beside a choice to put it on every position.

Details & billing tab (people who can edit PPM schedules)

The contract's settings, in this order:

  • Renewal — Renew Contract and Renewal status: … (renewal quoted, renewed, not renewing, clear), with the RENEWED / NOT RENEWING / RENEWAL QUOTED banners above.
  • Contract Details — name, Service (only when your company has contract services under PPM/Insp → Setup → Contract services — for example PPM or Bureau; one per contract, kept on renewal), start and end date, Customer Ref / PO Number (with Apply this Customer Ref to all jobs created from this contract and PO mandatory for this contract), notes, and Pause all schedules in this contract. Save.
  • Auto-Invoicing Settings — contract billing, Next Invoice Date, Create Invoice Now, invoice wording.
  • Invoices and Quotes — the contract's invoices and quotes, each with a count.
  • Renewal Quote Settings — automatic renewal quotes.
  • When a Visit Comes Due — Defaults — what new schedule rows on this contract start with: Default due action and Default cadence, saved with Save Due Action Defaults. Booking reminders, appointment reminders, how visit quotes are grouped and the planner strip apply to every contract and are on PPM/Insp → Setup (a link on the card says so).

Each of these is described in the PPM Contract Schedule Builder doc.

Schedules tab (read-only — people who cannot edit PPM schedules)

  • This contract, in plain English — the contract, its customer, how many schedules at how many sites, its dates and whether it is billed through the contract, then this year's visits (done, skipped, overdue, to come, booked). A button beside it says how many things are worth a look (for example jobs created too late to see them coming, overdue visits, a schedule that names an engineer but does not go on the planner, or a contract paused because the customer is on hold); click it to read them. Nothing to look at means none were found.
  • A key of the colours (Done, Booked, Upcoming, Overdue, Skipped) and the checksheet letters (· = general visit, a number = how many visits fall in that month), and arrows to move a year back or forward (This year comes back).
  • Each schedule as a card — its sentence and its settings (Every, On, Time, Engineer, On the planner, Created days before, Starts, Ends, Price a visit), read-only — with a row of months under it for each piece of equipment.
  • Click a month to list that month's visits under the table (date, checksheet, status, planner booking, job link). Arrow keys move between months.
  • Print (top bar) prints the page as a landscape sheet — handy when a customer asks for their PPM planner.

Details & billing tab (read-only)

Billed through the contract (how often, in advance or arrears, and whether invoices are created automatically — or No — visits are invoiced like any other job), Next invoice, Last invoiced, Annual value (set by hand or from the schedules), Service (when the contract has one), Customer ref / PO and Renewal.

When the contract has Agreed yearly prices (a contract made from a PPM quote of more than one year, or one given yearly increases by hand), the read-only card is shown under the summary: each year, the day it starts, its increase, its annual value and whether it has been Applied, with the total over the term. People who can edit PPM schedules see and change the same card on their Details & billing tab, under Contract Details — see PPM Contract Schedule Builder.

Agreed yearly prices — what happens on an anniversary

On each anniversary of the contract's start date, the visit prices move to that year's agreed price by themselves and the contract's annual value follows; nobody has to change a price. A visit job made before the anniversary for a visit due after it, and a contract period invoiced in advance, already use the new year's price. An increase agreed as an amount is shared across the visit prices and can land a few cents either side of the sum — the contract, its PDF and its invoices always use the real figure. The years count from the contract's start date, so a contract without one never moves. A renewal quote made from the contract starts with the same years.

What You Can Do Here

  • See a contract's header, status and dates at a glance.
  • Change every schedule in the Schedule Builder and watch its visits redraw before you save.
  • Book, re-plan, create, skip or put back one visit from under its schedule.
  • Choose the checksheet and job preset for one position of a schedule's pattern, or for every visit.
  • Bring a stale next visit forward with Carry on from today.
  • Change the contract's details, billing, renewal and due-action defaults on Details & billing.
  • Without edit rights: read the plain-English summary, see and print the year of visits, and read the billing summary.

Common Tasks

Book one visit on a particular day

Schedule Builder tab → click the visit's cell under its schedule → Book (or Re-plan) → pick the date, times and engineer → Book it.

Skip one visit

Click the visit's cell → Skip this visit → give the reason. Put it back undoes it.

Change how often a schedule repeats

Change the row's Frequency — the visits under it redraw dashed so you can check them — then press the row's ✓. Jobs that already exist are not touched. If the line The next visit is not until … appears afterwards, press Carry on from today.

Make a schedule's jobs land on the planner, booked, ahead of time

On the row: set the Engineer, the Starts … lasts … ends time, tick Add to planner, set the days before due (14–28 is usual for weekly visits), then ✓. The sentence under the row then says each job is created that many days ahead and put on the planner. Jobs that already exist are not changed — book them one by one, or tick them on the Visits page and use Book selected….

Use a different checksheet on one visit in the cycle

Click a visit in that position → under This visit uses, pick the checksheet for each piece of equipment (or Not on this visit) → Save what this visit uses. Every visit in that pattern position follows it.

Email a contract

Press Email at the top of the contract. An email window opens with the contract PDF already attached (made from your default contract template — or the one you pick):

  • To is filled in for you. By default it is the customer's contacts ticked Invoice; you can change which contacts are used for every contract under PPM/Insp → Setup (invoice contacts, quote contacts, service contacts, or just the customer's own email).
  • The contact picker beside To and CC lists the customer's contacts that have an email address — name, job title, site and what they are ticked for, primary contacts first — plus the customer's own email. Search it and press + To or + CC to add someone. It never removes what you typed.
  • The subject and message come from the PPM contract email in Setup → Email Setup; change them in the window before you send if you need to.

Sending needs permission to edit PPM schedules. After sending, the Emailed chip appears (or Email failed if it could not be delivered) and the email is listed under Comms.

Send a contract for signature

Press Send for signature. The same email window opens with the signature request email from Email Setup, which carries a Review and sign button for the customer.

  • The customer opens the link, reads the contract exactly as you sent it, types their name and job title, signs on screen and confirms. If your settings allow it they can decline instead, with a reason.
  • The contract shows Awaiting signature until then, and you can Send reminder or Cancel request from the chip.
  • Once they sign, the chip reads Signed by … on …. The signed copy — the contract with their signature in the signature box and a page recording who signed, when and from where — is kept on the contract and filed in the customer's Documents. You are told, and the customer can be emailed their signed copy.
  • If the contract changes after it was sent (for example the price or the schedules), the customer cannot sign the old version: the link tells them an updated copy is coming. If it changes after they signed, the contract shows Changed since signed with a Re-send button to ask for a new signature.

The settings (how many days the link stays valid, whether the customer may decline, whether they are asked for a reference / PO, and whether they are emailed their signed copy) are under PPM/Insp → Setup. For the signature box to appear where you want it on the contract, add the customer's signature box to your contract template (Setup → PDF Templates → PPM Contracts Template); without it the signature is added on a page at the end.

Common Mistakes

  • Looking for the old Year, Rules or Visits tabs, the Viewing / Editing switch, Add a schedule or Paste from a spreadsheet on the contract page — they are gone. Schedules are added with Add Row, Quick Add or Upload in the Schedule Builder; a visit is booked from under its schedule; every visit across contracts is on the Visits page.
  • Expecting a row change to save itself — the dashed visits are only a preview until you press ✓.
  • Expecting a schedule change to move jobs that already exist — it changes visits not created yet. Existing jobs are booked or moved from under the schedule, the Visits page or the planner.
  • Ticking Add to planner with no engineer — the jobs still wait in Open Jobs; the row warns Assign an engineer for this to work.
  • Looking for booking reminders on a contract — they apply to every contract and are on PPM/Insp → Setup.
  • Asking why a colleague sees a different page — people without permission to edit PPM schedules see the read-only Schedules view.
  • PPM Contracts — the list of contracts; New Contract offers Regular visits plan or Full contract.
  • PPM Contract Schedule Builder — every column, button and setting of the Schedule Builder and Details & billing tabs.
  • PPM Visits — every visit across all contracts with its booking status, and Book selected… for many at once.
  • Planner — booked visits; visits a schedule will put there by itself show dashed as Upcoming in the engineer's row on the day view, and unplanned due visits show in the PPM due strip (clicking one opens its schedule here).
  • PPM Setup — company-wide visit settings, who a contract email goes to, the signing settings, and the other PPM settings pages.
  • PPM Contract Templates — the layout of the contract PDF, including the customer's signature box.
  • Incidents and audits — an incident or audit can be linked to a PPM contract. The contract then lists it on an Incidents & audits card, with a button to report or start another one already linked — on the contract's own details page, the one the link on the incident or audit opens. The card only shows when the Incidents and/or Audits module is on and you can view it.